My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/4/2001
CBCC
>
Meetings
>
2000's
>
2001
>
12/4/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2018 4:26:31 PM
Creation date
9/25/2015 4:32:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
12/04/2001
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
2549
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Department of Utility Services is exploring one of the alternatives outlined in CDM's report; mixing a <br />portion of the concentrate with storm water/reclauned water. The Department of Utility Services is requesting <br />the Board Of County Commissioners to authorize applying for the grant, with a commitment of matching <br />funds to implement the project <br />ANALYSIS <br />The attached grant application will be submitted to SJRWMD for a project to supplement reclaimed water with <br />a mixture of stormwater and concentrate for irrigation purposes The concentrate discharge from the R.O. <br />process will be routed to the North Relief Canal along 58'h Avenue Concentrate will be discharged into the <br />North Relief Canal and allowed to mix with stormwater and flow to the intersection of the Lateral G Canal. At <br />that point a control structure will be constructed to retain the stormwater/concentrate mixture for recovery and <br />reuse as irrigation. <br />Project costs are estimated as follows <br />Stormwater Mixmv with Brine <br />137500 L.F. 16" Brine Line <br />Control Structure E/0 Lateral G Canal <br />Pumping Station at Wetlands Headworks <br />Wetlands Construction ' <br />Pumping Station at Wetlands Tailworks <br />Lateral G Overflow Structure <br />Construction Subtotal <br />15% contingency <br />Construction Total <br />Engineering Permitting and Inspection (14.690 Construction Subtotal) <br />Total Project Cost <br />$9207000.00 <br />$7207000.00 <br />$26500.00 <br />$2657000.00 <br />$265700000 <br />$265.000 00 <br />$2,7001000 00 <br />$405,00000 <br />$35105,000.00 <br />$395,000.00 <br />$3,5007000.00 <br />The total project cost as outlined above is $3,500,000.00 The County will request a $150,000 00 (4.29%) <br />grant. The County's total share will be funded from the capacity charge fund, Account Number 472-000-169- <br />392.00. <br />RECOMMENDATION <br />The staff of the Department of utility Services recommends that the Board of County Commissioners approve <br />the grant application, authorize matching funding of construction of the projects outlined above (upon receipt of <br />grant), and authorize the Chairman to execute applications and agreements associated with grant, as presented. <br />Commissioner Adams questioned the balance in the capacity charge fund, and <br />Utilities Department Director Erik Olson stated that he would check and let her know. <br />Commissioner Adams remarked that this is a 3.5 million dollar project with only <br />$150,000 coming back in grants from SJRWMD. <br />Director Olson hoped that this is the first of what staff believes to be a number of <br />grants. This one became available very quickly but the intent is to take advantage of grants <br />through the Legislature and St. Johns River Water Management District. <br />DECEMBER 4, 2001DWI%g `w t <br />-115- <br />
The URL can be used to link to this page
Your browser does not support the video tag.