Laserfiche WebLink
• <br />West (abuts lateral canal and 58th Street): The applicant has committed to a 30' no <br />build zone with a Type "D" buffer and a 4' opaque feature, using a wall/berm <br />combination. Again. the applicant is proposing to phase the landscape material as <br />described above. The buffer is a required improvement which needs to be constructed <br />with the subdivision improvements. The Planning and Zoning Commission and staff <br />recommend a Type "B" buffer with 6' opaque feature on the west side. <br />15. Dedications and Improvements: <br />111 <br />12th Street Right -Turn Lane: As indicated in the Traffic Circulation section. a right - <br />turn lane at the project's entrance is recommended as a required PD improvement. <br />The right -turn lane would not need to be constructed until Phase II. <br />12'h Street Left -Turn Lane: As indicated in the Traffic Circulation section, a left -turn <br />lane is required at the project entrance. The left -turn lane is not required until Phase <br />II. <br />External Pedestrian System: The county's Sidewalk and Bikeway Plan requires an <br />8' wide pedestrian path along the project's 12`h Street frontage. The pedestrian path <br />will need to be built or bonded out prior to the issuance of a certificate of completion <br />for the subdivision improvements. <br />Internal Pedestrian System: An internal pedestrian system is required for planned <br />developments. The applicant is proposing a sidewalk along one side of the internal <br />roadways, which is acceptable to staff. The sidewalk will need to be built or bonded <br />out prior to the issuance of a certificate of completion. <br />12th Street Right -of -Way: The county's Thoroughfare Plan designates 12'" Street as <br />a minor arterial roadway requiring 100' of right-of-way Presently, 100' exists for the <br />west i/z of the project, and the county is seeking to acquire an additional 16' at the 12th <br />Street/58th Avenue intersection through negotiated purchase. There is 50' of right- <br />of-way for 12ih Street on the east' of the site. The applicant will need to dedicate <br />without compensation an additional 10' to complete the 60' local road standard and <br />accommodate purchase of the remaining 40' that is needed. The proposed plan does <br />accommodate the future acquisition of the 40' on the east side and the 16' on the west <br />side of the project site. <br />Emergency Access: An emergency access connection to 12`" Street in Phase I has <br />been approved by Emergency Services. A final design specifying width. surface <br />material, and access control will need to be approved by Emergency Services and <br />Engineering prior to issuance of an LDP. The applicant will need to build and obtain <br />Emergency Services and Engineering approval for the connection prior to the <br />issuance of a certificate of completion for Phase I. <br />16. Public Benefits: As part of the PD review, public benefits above those that could be required <br />with a conventional development have been identified. One of those benefits is a 30 "no - <br />build" area around the project perimeter. In a standard RS -3 subdivision, pool enclosures <br />could be constructed as close as 10' to the rear property line, and residences could be <br />constructed as close as 25'. The proposed 30' no -build area exceeds the 25' and 10' setbacks <br />that would otherwise be allowed Another benefit is preservation of a 1.09 acre area that <br />February 13, 2001 <br />61 <br />BK 117PG073 <br />