Under the current contract agreement with AES, sixteen (16) 6 -inch Butterfly control <br />yak .es were slated for replacement in the overall project under bid item Number 1. Each <br />RO treatment train is constructed with 16 control valves, for a total of 64 valves for the <br />four RO treatment trains (4 x 16 = 64) As stated, the project called for 16 of the valves to <br />be replaced and for 48 of the current 64 control valves to be refurbished and reused. Upon <br />further inspection of the 43 control valves set for refurbishment an additional 16 are in.. <br />need of replacement. This brings the total number of control valves to be replaced to 32 <br />for the entire project. The additional cost for the 16 additional valves is S16,480.00. (See <br />attached Exhibit A for breakdown.) <br />Staff has also determined that 9 (nine) -conductivity sensors and 1 (one) pH sensor are <br />obsolete and are in need of replacement as pan of this project. These sensors were not <br />included as part of the original bid. The sensors are part of the overall monitoring and <br />control system for the 4 RO treatment trains. The additional cost for replacement of the <br />ten sensors is 35,943.75 (See attached Exhibit B for breakdown.) <br />RO treatment trains #1 and #2 currently are fitted with 2 -inch concentrate reject valves. <br />RO treatment trains #3 and #4 are fitted with 3 -inch concentrate reject valves. The <br />concentrate reject valve directs the RO concentrate from the treatment train into the <br />concentrate treatment and disposal system. It is staff's desire to standardize all four <br />treatment trains with 3 -inch concentrate reject valves. This conversion was not part of the <br />original bid. The additional cost for converting the 2 -inch valves on trains #1 and #2 is <br />32400.00. (See attached Exhibit C ) <br />As part of the overall approved 51,034,822.00 contract for the replacement of the RO <br />Membranes and ancillary equipment, bit item # 11 provided for a project contingency of <br />525,000.00. Staff has reviewed this amount of contingency and is requesting Board <br />approval to increase the project contingency from 2.5% to 5%. This would increase the <br />project contingency from 325,000.00 to 550,000.00. <br />The following is a summary of Change Order Number 1: <br />Original Contract Price <br />Desert tion <br />Purchase of 16 (sixteen) additional 6 (six) inch Butterfly control valves <br />Purchase of 10 (ten) monitoring, and control sensors <br />Coni ersion of two 2 -inch re ect valves to 3 -inch <br />Continuenc increase <br />4mended Contract Price as a result of Chancre Order Number 1 <br />RECOMMENDATION <br />Amount <br />31,034,822.00 <br />316,480.00 <br />$5,943.75 <br />32400.00 <br />525,000.00 <br />51,084,645.75 <br />It is the recommendation of the Staff of the Department of Utility Services that the Board <br />of County Commissioners approve Change Order Number 1, for an amended contract price <br />of S1,084,645.75. <br />FUNDING SOURCE <br />471-000-169-377.00 — Renewal and Replacement ( R&R) <br />FEBRUARY 5, 2002 <br />-94- <br />1 <br />