My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/12/2002
CBCC
>
Meetings
>
2000's
>
2002
>
3/12/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 2:10:57 PM
Creation date
9/25/2015 4:36:57 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
03/12/2002
Archived Roll/Disk#
2554
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Plan Review / Building Permit Process <br />City of Vero Beach <br />Civil Engineer <br />St. Johns Permit <br />Concurrency Review <br />Impact Fees <br />County Transportation <br />VB Elect. <br />Modular <br />$ 350.00 <br />$ 10,000.00 <br />$ 350.00 <br />$ 100.00 <br />43rd <br />NA <br />NA <br />NA <br />NA <br />$ 14,875.20 NA <br />Meter fee $ 7,935.00 NA <br />Connection fee I $ 750.00 $ 750.00 <br />VB Utilities <br />5/8' Water Meter <br />Sewer $212/6 fixtures <br />Backflow Preventor (Fireline) <br />Connection Costs. <br />Building Permit Fee <br />Data & Voice Connection Costs <br />Building Setup fees or Build -out <br />Delivery $112,500.00 <br />Set-up Complex $ 3,300.00 NA <br />Other services $ 19,540.00 NA <br />$3,600.00 NA <br />$ 4,186.00 NA <br />$ 20,000.00 NA <br />Landscaping $ 20,000.00 NA <br />Site Preparation $ 20,000.00 NA <br />10% Contingency $ 2,500.00 NA <br />$ 12,000.00 $ 1.3,000.00 <br />TOTAL $163,596.20 $147,119.00 <br />$ 13.00 <br />$ 13.00 <br />$ 1,016.00 ! $ 1,016.00 <br />$ 566.00 NA <br />$ 9,000.00 NA <br />$ 5,000.00 NA <br />$ 130.00 NA <br />$8,385.00 $ 19,840.00 <br />skirting <br />Parking @$13 S.Y. <br />Storm Water <br />Annual Lease Price I $ 59,928.00 J <br />$ 54,000.00 <br />As can be seen from the totals above, there is about a $16,477 difference shown between the two <br />proposals as to front-end costs. The difference in the annual lease cost is about $6,000. Staff is <br />searching to determine if a location other than the grassed area in the front of the Administration <br />Building can be found. <br />General Services Director Tom Frame briefly reviewed the options for the Board and <br />noted that he had also investigated the employee parking area to the east. Use of that area <br />would involve the loss of some parking and the responsibility to provide additional parking. <br />There is no easy solution to the problem. <br />Supervisor of Elections Kay Clem reiterated that the need is to have the voting <br />machines in the same place as the tabulation equipment. The split between the storage area <br />and the offices is the cause of the present problem and the storage area presently provided <br />MARCH 12, 2002 <br />-26- <br />65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.