My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/12/2002
CBCC
>
Meetings
>
2000's
>
2002
>
3/12/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 2:10:57 PM
Creation date
9/25/2015 4:36:57 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
03/12/2002
Archived Roll/Disk#
2554
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Utilities and Services <br />The site is within the Urban Service Area of the county. Wastewater service is available to the site <br />from the West Regional Wastewater Treatment Plant. Centralized potable water service is available <br />to the site from the South County Reverse Osmosis Plant. <br />Transportation System <br />Access to the site is via a driveway off of 9`h Street SW (Oslo Road). Classified as a niral minor <br />arterial on the future roadway thoroughfare plan map, 9th Street is a two lane road. Although the <br />current right-of-way width is 60 feet, this segment of 9`h SW Street is programmed to contain 130 <br />feet of public road right-of-way by 2020. <br />ANALYSIS <br />In this section, an analysis of the reasonableness of the rezoning request will be presented. <br />Specifically, this section will include: <br />• an analysis of the request's impact on public facilities; <br />• an analysis of the request's consistency with the county's comprehensive plan; <br />• an analysis of the request's compatibility with the surrounding area; and <br />• an analysis of the request's potential impact on environmental quality. <br />Concurrency of Public Facilities <br />This site is located within the county Urban Service Area, an area deemed suited for urban scale <br />development. The Comprehensive Plan establishes standards for: Transportation Potable Water, <br />Wastewater, Solid Waste, Drainage and Recreation. The adequate provision of these services is <br />necessary to ensure the continued quality of life enjoyed by the community. The Comprehensive <br />Plan and Land Development Regulations (LDRs) also require that new development be reviewed <br />to ensure that the minimum acceptable standards for these services and facilities are maintained. <br />Policy 3.2 of the Future Land Use Element states that no development shall be approved unless it <br />is consistent with the concurrency management system component of the Capital Improvements <br />Element. For rezoning requests, conditional concurrency review is required. <br />Conditional concurrency review examines the available capacity of each facility with respect to a <br />proposed project. Since rezoning requests are not projects, county regulations call for the <br />concurrency review to be based upon the most intense use of the subject property based upon the <br />requested zoning. For commercial or industrial rezoning requests, the most intense use (according <br />to the County's LDRs) is 10,000 square feet of retail commercial space per acre, given the size of <br />the property and the maximum density under the proposed zoning The site information used for the <br />concurrency analysis is as follows: <br />1. Size of Area to be Rezoned: 126 acres <br />2. Land Use Designation: C/I, Commercial/Industrial <br />3. Existing Zoning District: A-1, Agricultural District <br />4. Proposed Zoning District: IL, Light Industrial District <br />5. Most Intense Use Under Existing Zoning District: <br />1 Dwelling Unit <br />6. Most Intense Use Under Proposed Zoning District: <br />12,600 sq. ft. of Retail Commercial (Shopping Center in the 6th Edition ITE Manual) <br />MARCH 12, 2002 <br />-31- <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.