Laserfiche WebLink
• <br />several minor changes (see attachment #5). Those changes have now been incorporated <br />into the proposed ordinance (see attachment #6). <br />The BCC is to consider the proposed ordinance at two public hearings scheduled for <br />March 19th and April 2nd , 2002. Two hearings are necessary because the ordinance, if <br />adopted will change the table of listed uses in the zoning code (Chapter 911). The two <br />hearing format will allow the Board the opportunity at the March 19th hearing to provide <br />direction for any desired changes that can then be reviewed in final form at the April 2nd <br />hearing. Adoption of an ordinance at the April 2nd hearing will "beat" the April 7, 2002 <br />moratorium expiration date. <br />ANNALYSIS <br />Currently, all types of commercial telecommunications facilities (wireless and non - <br />wireless) are regulated under LDR sections 971.44(1) and 917.06(8); section 971.44(4) <br />applies only to taller amateur radio facilities [see attachment #1]. <br />The proposed LDR amendments do not change the requirements of these existing LDR <br />sections Rather, the proposed amendments specify that the existing commercial tower <br />regulations of 971.44(1) will apply to non -wireless facilities (e.g. radio, T;V., broadcast <br />and receiving facilities). Wireless facilities will be controlled by a new subsection of <br />regulations contained in the proposed ordinance. That subsection, to be codified as <br />subsection 971.44(5), consists of a revised version of the ordinance presented by <br />CityScape at the November 13`h workshop. For reference purposes, that section of the <br />proposed ordinance is currently coded to show the changes that have been made to it <br />since the November 13`h workshop. Such changes include those recommended by the <br />PZC at its February 28, 2002 meeting. <br />• Summary of New Regulations <br />The proposed interim ordinance specifically applies the existing 971.44(1) criteria to non - <br />wireless telecommunications towers and facihties. It also contains the propose° new <br />wireless facilities regulations. The proposed wireless facility regulations contain aspects <br />that are similar to the existing 971.44(1) regulations. Several of the main requirements, <br />however, are new and/or more stringent than current requirements, as summarized below. <br />The proposed Subsection 971.44(5): <br />1. Specifies the hierarchy of preferred facility types, from the most desirable to least <br />desirable, as follows: <br />a. Collocation (on existing tower/antenna support) <br />b. Attached (to non -antenna support structure such as a building, utility pole, <br />water tower) <br />c. Replacement (of existing tower/antenna support structure) <br />d. Stealth (previously termed "camouflaged" tower) <br />e. New (new tower/antenna support structure on a new site) [see attachment <br />#6, pg. 17]. <br />2. Defines and allows use of "breakpoint tecmology" whereby engineered stress points <br />in structures are designed to better control weather -induced tower failures [pp. 13 & <br />20]. <br />March 19, 2002 <br />79 <br />Bir I 4 <br />• <br />