My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/20/2001 (2)
CBCC
>
Meetings
>
2000's
>
2001
>
3/20/2001 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2023 11:37:55 AM
Creation date
9/25/2015 4:15:42 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
03/20/2001
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
2275
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTION WAS MADE by Commissioner Adams, SECONDED <br />BY Vice Chairman Stanbridge, not to grant the rezoning (later <br />clarified to include not amending the Comprehensive Plan <br />Future Land Use Designation). <br />Under discussion, Vice Chairman Stanbridge recalled the last time this was brought <br />to the Board, she questioned the property as being in the flow plan of the St. Sebastian River. <br />Also, historically, the canal system that runs along CR 512 actually connects with the flow <br />plan through Vero Lake Estates. Corralling the stormwater in the Vero Lake Estates area is <br />being worked on diligently. Many of those lots are in a flow plain and now the County is <br />having to take care of that situation. She suggested this might be considered sprawl which <br />might create a new village or a new town. She had problems with it and did not want to put <br />anyone else in harm's way. <br />It was established that this project would be located within the urban service area and <br />when developed would be required to meet all stormwater criteria for the site. <br />Vice Chairman Stanbridge understood but felt it would impact other properties. <br />Chairman Ginn observed that several creeks throughout the property empty into the <br />river, and Vice Chairman Stanbridge explained the areas have been channelized, advised of <br />the master stormwater plan in the district, and told how the County is working on Vero Lake <br />Estates drainage problems Tremendous dollars are being spent to get control of the <br />stormwater drainage. To add additional homes in the area does not compute. What the <br />Board allows in this area will affect those living in many of the other surrounding properties. <br />In response to the inquiry, Commissioner Adams clarified that her motion included <br />not amending the Comprehensive Plan in this matter because it would not be appropriate due <br />to the proximity of the headwaters of the St. Sebastian River. Also it would create a domino <br />March 20, 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.