Laserfiche WebLink
• <br />MOTION WAS MADE by Commissioner Adams, SECONDED <br />13Y Commissioner Tippin, to approve staffs recommendation. <br />Under discussion, Commissioner Adams inquired how this was miscalculated, and <br />Community Development Director Robert M. Keating advised it was done by the project <br />engineer and pointed out to staff After that he went back to the project engineer and the <br />surveyor and had them reconfirm; that was when they determined the area was less than <br />originally stated. <br />Planning Director Stan Boling added that the County's surveyor will do the <br />calculation on the area for the new plans that are being submitted. The previous calculation <br />was calculated based on the old survey and should have been recalculated. It was a pretty <br />unusual situation. <br />THE CHAIRMAN CALLED THE QUESTION and the motion <br />carried unanimously. (4-0, Commissioner Macht absent) <br />11.B. PURCHASE OF RACAL COMMUNICATIONS LOGGING <br />RECORDER FOR VERO BEACH POLICE DEPARTMENT E911 <br />PUBLIC SAFETY ANSWERING POINT (PSAP) ON A SOLE SOURCE <br />BASIS - REPLAY SYSTEMS <br />The Board reviewed a Memorandum of February 16, 2001: <br />TO: <br />Honorable Board of County Commissioners <br />THROUGH: James E. Chandler, County Administrator <br />FROM: Douglas M Wright, Director <br />Department of Emergency Services <br />March 6, 2001 <br />111 <br />'1 7PU370 <br />• <br />