My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/17/2001
CBCC
>
Meetings
>
2000's
>
2001
>
4/17/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 7:52:40 PM
Creation date
9/25/2015 4:18:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
04/17/2001
Archived Roll/Disk#
2277
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Note : The submitted open space calculation consists of 323 . 9 acres of agricultural preserve <br /> area . 120. 7 acres of lake area. 183 . 3 acres of "recreational area", 21 . 7 acres of perimeter <br /> buffer. and 60 % of the individual lot area. <br /> 7 . Surrounding Land Use and Zoning : <br /> North : Grove and Pasture/A- 1 <br /> South : Grove and Pasture/A - 1 <br /> East : 82nd Avenue , Grove and Pasture/A- 1 <br /> West : Pasture/A- 1 <br /> 8. Agricultural Preserve Area : The applicant is proposing agricultural preserve areas on the <br /> north and south sides of the golf course and residential development area. <br /> Under the proposed plans . the resulting project area breakdown would be as follows : <br /> • Golf course and residential development area. . . . . . 515 .20 acres <br /> • North agricultural preserve area . . . . . . . . . . . . . . . . . . . . . . . . . . . . 142 . 86 acres <br /> • South agricultural preserve area. . . . . . . . . . . . . . . . . . . . . . . . . . . . 181 . 04 acres <br /> Total . . . . . . . 839 . 10 acres <br /> The agricultural preserve areas have been "mined or stripped" of their density of 1 unit per <br /> 5 acres with that density transferred into the golf course and residential development area . <br /> The agricultural preserve areas are presently grove . The Southern preserve area is in a <br /> traditional block or square configuration ( 2 .656' by 3 , 100' ) , while the northern preserve area <br /> is more narrow in its north/south width ( 1 . 230' by 4 ,980' ) . If the PD plan is approved, the <br /> preserve area would need to be maintained as grove or some other type of other agricultural <br /> use or as open-space . This preservation would need to be ensured through restrictions on the <br /> final plat ( e . g . , open space easement ) and a covenant that would run with the land in favor <br /> of the County and future lot owners . <br /> 9. Traffic Circulation : The plan proposes a single access point for the project. Located in the <br /> 4700 block of 82nd Avenue, the project access road connects to an internal local road system <br /> that will loop through most of the site . The proposed system includes some short cul -de - <br /> sacs to provide access to the single family lots . If the project is approved, the applicant will <br /> be required to pave 82nd Ave from the existing paved section to the project entrance , prior <br /> to the issuance of a certificate of completion for Phase I . <br /> As of this time, Public Works staff has been unable to document whether or not sufficient <br /> right - of- way exists in order to pave 82nd Avenue to the project entrance . Consequently , <br /> staff, in its TRC review , asked the applicant to provide legal documentation of any 82nd <br /> Avenue right-of- way . The applicant is still in the process of researching this information . <br /> If the project is approved, the applicant will need to either document that adequate right-of- <br /> way exists for 82nd Avenue to pave 82nd Avenue from the end of the paved section to the <br /> project, or will need to otherwise ensure that necessary right-of- way is acquired . The <br /> documentation will need to be provided or the right-of- way acquired prior to the issuance of <br /> a land development permit . <br /> A traffic impact analysis ( TIA ) has been submitted by the applicant and reviewed and <br /> approved by the Traffic Engineering Division . As a result of the TIA, a north bound left turn <br /> lane is required along 82nd Ave at the project entrance . The north bound left turn lane will <br /> need to be constructed with the first phase of the development, and accepted by the County <br /> prior to the issuance of a certificate of completion . <br /> April 17 , 2001 <br /> 28 <br /> BK 1 G 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.