My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/9/2002
CBCC
>
Meetings
>
2000's
>
2002
>
4/9/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 1:52:34 PM
Creation date
9/25/2015 4:38:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
04/09/2002
Archived Roll/Disk#
2555
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br />On September 29, 1995, Indian River County entered into an Agreement with the City of Sebastian to <br />assume ownership of the City's water distribution and wastewater collection systems. As a part of the <br />contract, the County agreed to expand the water distribution system. On June 18, 1996, the Indian River <br />County Board of County Commissioners approved Staffs recommendation for the County to proceed <br />with the installation of water lines as set forth in the Inter -local Agreement between Indian River County <br />and the City of Sebastian. Said Agreement provided for the transfer of the City of Sebastian's water and <br />wastewater system to Indian River County. <br />On July 24, 2001, at a public hearing, the Board of County Commissioners approved combining Phase's <br />III -B & III -C for construction and bidding purposes. Construction of Phase III -B is complete and III -C <br />should be completed by September 2002. (See attached agenda item and copy of minutes —Attachment 1.) <br />Staff is now ready to proceed with Phase's III -D & IH -E, which will complete the installation of <br />approximately 109.4 miles of water lines in Sebastian Highlands. <br />ANALYSIS <br />Within the Phase III -D & III -E project area. East & West of Laconia Street. between Clearmont Street & <br />Capon Terrace. and between Granduer & Gladiola Avenue's there are 1433 lots and tracts, and <br />approximately 602 homes, to benefit from this project. Typical platted lot sizes are .25 acre, plus or <br />minus. <br />More effective management of project construction, inspections, cash flows, and interaction with property <br />owners is being accomplished by having divided Phases II and III into smaller projects. This has enabled <br />more utility construction contractors to bid on these projects. possibly making the bid process more <br />competitive. The attached map displays the area to benefit from the assessment projects, as divided into <br />parts A, B, C, D & E for Phase III (Attachment 2) This project will provide potable water and fire <br />protection to an area noted for failing well systems. The City of Sebastian is waiting for the completion <br />of the water fine installation in order to complete road & drainage improvements and comply with <br />bonding requirements. <br />Engineering design has been completed by the staff of the Department of Utility Services and we are now <br />ready to begin the assessment process associated with this project, as outlined herein. A summary <br />assessment roll for Phase III -D & E is attached (Attachment 4). The full assessment roll is on file in the <br />commission office. This project is to be paid through the assessment of property owners along the <br />proposed water line route. Financing will be from the assessment fund 473. If needed, inter -fund <br />borrowing will be available from the capacity fee fund 472. The estimated project cost and amount to be <br />assessed for Phase's III -D & III -E is S 3,166,394.30 (rounded) (Attachment -3). The estimated cost per <br />square foot is 50.217507 (rounded). The actual assessed cost. as with any project will be determined <br />based on actual competitive bid prices <br />April 9, 2002 <br />52 <br />3U� <br />Project No. <br />Lots <br />Parcel <br />Nos./ <br />Homes <br />I.D. <br />-ALL <br />OF <br />PHASE <br />Locations <br />SOUTH <br />OF <br />CR <br />512 & <br />HI IS <br />SOUTHWEST <br />OF <br />BARBER STREET <br />III -A UW -97 -I6 -DS <br />891 <br />786 / 384 <br />South of Caravan Terrace with Periwinkle Drive <br />along the South & West <br />III -B UW -97 -17 -DS <br />530 <br />458 / 239 <br />East of Laconia St.& West of Shakespeare Si. <br />Between Crystal Mist & Lanfair Ave's <br />III -C UW -97 -18 -DS <br />900 <br />822 / 414 <br />Between Laconia & Barber St's , between Bayfront <br />Terrace and Rolling Hills (Lansdowne) <br />698 <br />639 / 279 <br />East of Laconia St., between Clearmont & Capon <br />Streets. <br />III -D L- W -97 -19 -DS <br />HI -E UW -97 -20 -DS <br />735 <br />654 / 323 <br />West of Laconia St, between Granduer & <br />Gladiola Avenue's <br />Total <br />3,754 <br />3,359 /1,639 <br />South of CR 512 and SW of Barber Street <br />Engineering design has been completed by the staff of the Department of Utility Services and we are now <br />ready to begin the assessment process associated with this project, as outlined herein. A summary <br />assessment roll for Phase III -D & E is attached (Attachment 4). The full assessment roll is on file in the <br />commission office. This project is to be paid through the assessment of property owners along the <br />proposed water line route. Financing will be from the assessment fund 473. If needed, inter -fund <br />borrowing will be available from the capacity fee fund 472. The estimated project cost and amount to be <br />assessed for Phase's III -D & III -E is S 3,166,394.30 (rounded) (Attachment -3). The estimated cost per <br />square foot is 50.217507 (rounded). The actual assessed cost. as with any project will be determined <br />based on actual competitive bid prices <br />April 9, 2002 <br />52 <br />3U� <br />
The URL can be used to link to this page
Your browser does not support the video tag.