My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/21/2002
CBCC
>
Meetings
>
2000's
>
2002
>
5/21/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 1:49:09 PM
Creation date
9/25/2015 4:40:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
05/21/2002
Archived Roll/Disk#
2557
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Contact was made with G.E. Capitol and we were advised that French doors could be added but <br />it would increase the monthly rental by $70.00 per month In order to stay on schedule, it is <br />requested that the Board approve this additional change. This will bring the monthly charge to <br />S5 964 per month and establish an annual cost of $71,568. <br />RECOMMENDATION: <br />Staff recommends that in order to provide a more acceptable door, that the change order be <br />approved by the Board authorizing an additional $70.00 per month in lease charges. <br />Commissioner Adams expressed her frustration that this project is getting out of <br />control. Almost every week another change is being presented. <br />General Services Director Tom Frame stated that the extra expense is to comply with <br />the required additional wind loads. <br />Commissioner Ginn commented that this change involves some safety issues. The <br />regular door only had a small glass pane and she, as well as the Supervisor of Elections, had <br />understood that the french doors were included in the original estimate. <br />Commissioner Adams noted that when the talks first began about the new voting <br />machines, there was no expectation that the whole Elections Office would have to be moved. <br />She was concerned that the project was getting totally "out of hand" and wondered when it <br />would stop. <br />Commissioner Macht commented that this is another unfunded State mandate. <br />Director Frame noted that the modular unit has been ordered and is in the process of <br />being manufactured. <br />ON MOTION by Commissioner Macht, <br />SECONDED by Commissioner Ginn, the Board, by <br />a 4-1 vote (Commissioner Adams opposed) <br />approved the Change Order with G. E Capital <br />Modular Space resulting in a monthly charge of <br />$5,964 and an annual cost of $71,568, as <br />recommended by staff. <br />• <br />MAY 21, 2002 <br />a4' <br />Lai <br />-59- <br />
The URL can be used to link to this page
Your browser does not support the video tag.