Laserfiche WebLink
11.H.1. REXFORD BUILDERS, INC. - WATER MAIN <br />REPLACEMENT ON 5TH STREET SOUTHWEST EAST <br />OF OLD DIXIE HIGHWAY (380 5TH STREET SW) <br />The Board reviewed a Memorandum of July 5, 2002: <br />DATE: JULY 5, 2002 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: W. ERIK OLSON Sot - <br />DIRECTOR OF UTILITY SERVICES <br />PREPARED AARON J. BOWLES, P E <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILITIES <br />SUBJECT: DEVELOPER'S AGREEMENT WITH REXFORD BUILDERS, INC. (FOR <br />WATER MAIN REPLACEMENT ON 5TH STREET S.W. EAST OF OLD DIXIE <br />HIGHWAY) <br />BACKGROTTND R, ANAT Y.STS <br />Rexford Builders, Inc. is proposing expansion of an existing commercial development located at 380 5th St. SW. <br />Rexford Builders is proposing to extend the existing water main from the right-of-way through their subject <br />property and provide a fire hydrant and required easement. <br />Currently there is an existing transite water main located along 5th Street SW east of Old Dixie Highway. In an <br />effort to reduce the amount of transite pipe being utilized within the County's service area, the Utilities <br />Department has requested the Developer install a PVC water main adjacent to the existing transite main, abandon <br />the transite water main in place, and connect the existing services and proposed fire service to the new PVC water <br />main. <br />Attached is a proposed Developer's Agreement with Rexford Builders, Inc. for full reimbursement of the <br />proposed PVC water main. The Developer's Agreement is stipulated to reimburse the Developer for the <br />County's share of the water main based on itemized invoices of installed materials on a percentage complete <br />basis -less 10.% retainage, monthly, with final payment and release of retainage at the time said facilities are <br />dedicated to the County (SC — 1.A of attached agreement). <br />As shown in Exhibit - B of the attached Agreement, the County's Share for installing the recommended <br />improvements is tabulated below and included in the attached Developer's Agreement is as follows: <br />Description <br />County's Share <br />Water Distribution Svstem <br />$26,035.50 <br />Total Project Cost 1 $26.035.50 <br />JULY 16, 2002 <br />-93- <br />D <br />• <br />0 <br />