Laserfiche WebLink
• <br />ANALYSIS <br />In this section, an analysis of the reasonableness of the rezoning request will be presented. <br />Specifically, this section will include: <br />an analysis of the request's impact on public facilities; <br />an analysis of the request's consistency with the county's comprehensive plan; <br />an analysis of the request's compatibility with the surrounding area; and <br />an analysis of the request's potential impact on environmental quality. <br />Concurrency of Public Facilities <br />This site is located within the county urban service area, an area deemed suited for urban scale <br />development. The Comprehensive Plan establishes standards for: Transportation, Potable Water, <br />Wastewater, Solid Waste, Stormwater Management and Recreation. The adequate provision of <br />these services is necessary to ensure the continued quality of life enjoyed by the community. <br />The Comprehensive Plan and Land Development Regulations (LDRs) also require that new <br />development be reviewed to ensure that the minimum acceptable standards for these services and <br />facilities are maintained. <br />Policy 3.2 of the Future Land Use Element states that no development shall be approved unless it <br />is consistent with the concurrency management system component of the Capital Improvements <br />Element. For rezoning requests, conditional concurrency review is required. <br />Conditional concurrency review examines the available capacity of each facility with respect to a <br />proposed project. Since rezoning requests are not projects, county regulations call for the <br />concurrency review to be based upon the most intense use of the subject property based upon the <br />requested zoning. For residential rezoning requests, the most intense use (according to the <br />County's LDRs) is the maximum number of units that could be built on the site, given the size of <br />the property and the maximum density under the proposed zoning. The site information used for <br />the concurrency analysis is as follows: <br />1. Size of Area to be Rezoned: 17.9 acres <br />2. Existing Zoning District. A-1, Agricultural District (up to 1 unit/5 acres) <br />3. Proposed Zoning District: <br />RS -6, Single -Family Residential District (up to 6 <br />units/acres) <br />4. Most Intense Use of Subject Property <br />Under Existing Zoning District: <br />5. Most Intense Use of Subject Property <br />Under Proposed Zoning District: <br />Transportation <br />3 Single -Family Units <br />107 Single -Family Units <br />As part of the concurrency review process the applicant has submitted a Traffic Impact Analysis <br />(TIA). The county's Traffic Engineering Division has reviewed and approved that TIA. A TIA <br />reports the number of peak hour/peak season/peak direction trips that would be generated by the <br />most intense use of the subject property under the proposed zoning district and assigns those <br />tnps to impacted roads. Impacted roads are defined in section 910.09(4)(b)3 of the county's <br />LDRs as roadway segments which receive five percent (5%) or more of the project traffic or fifty <br />(50) or more project trips, whichever is less. <br />JULY 16, 2002 <br />-45- <br />• <br />