My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/24/2001
CBCC
>
Meetings
>
2000's
>
2001
>
7/24/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 9:32:55 AM
Creation date
9/25/2015 4:25:14 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
07/24/2001
Archived Roll/Disk#
2279
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br />(.in July 3, 2001, the Indian River County Board of County Commissioners approved Resolutions 2001-061_ <br />IKesolution I) and 2001-062 (Resolution 11J, which contained the preliminary assessment roll and established the <br />date of the public hearing for the subject project. Property owners have been notified of the public hearing by mail. <br />Resolution 2001-061 was published in the PRESS JOURNAL on July 9, 2001 .(See attached agenda item and cope <br />of- Implementation -Attachment 1) <br />Design of the water distribution system has been completed by staff. We are now ready to proceed with Phase III -C. <br />ANALYSIS <br />On July 12. 2001 at 7:00 p.m., an informational meeting was held for the benefit of the property owners, in the multi <br />—purpose room at the Pelican Island Elementary School in Sebastian. <br />For bidding and construction efficiency staff proposes combining Phases III -B & III -C. When the final assessment <br />is prepared at the completion of the two phases a single assessment roll will be prepared at an equalized rate. Staff <br />is now ready to proceed with Phase III -C. <br />Within the Phase III -C project, between Laconia & Barber Streets & between Rolling Hill's Drive & Bavfront <br />Terrace. there are 899 lots and approximately 414 homes, to benefit from this project. Typical platted lot sizes are <br />25 acre, plus or minus. <br />Although more effective management of project construction, inspections, cash flows. and interaction with property <br />owners is being accomplished by having divided Phases II and III into smaller projects staff believes that by <br />combining Phase III -B and III -C and perhaps combining III -D and III -E property owners will benefit and obtain a <br />more equalized cost. This is a result of input received at informational meetings. This may encourage more utility <br />construction contractors to bid on these projects possibly making the bid process more competitive. The attached <br />map displays the area to benefit from the assessment projects, as divided into parts A, B, C, D & E. for Phase III <br />(Attachment 3) This project will provide potable water and fire protection to an area noted for failing well systems. <br />The City of Sebastian is waiting for the completion of the water line installation in order to complete road & <br />drainage improvements and comply with bonding requirements. <br />Project No. <br />Lots <br />Parcel <br />LD. <br />Locations <br />iNosJ <br />Homes <br />ALL OF PHASE HI IS SOUTH OF CR 512 & <br />I <br />SOUTHWEST OF BARBER STREET <br />I <br />-A <br />UW -97 -16 <br />-DS <br />891 j <br />786 i <br />384 <br />I <br />South of Caravan Terrace with Periwinkle Drive along 11 <br />L"] <br />i <br />South & .& West <br />ithe <br />III -B <br />UW -97 -17 <br />-DS <br />1 530 <br />458 ! <br />239 i <br />East of Laconia St of Shakespeare St.. <br />Between Crystal Mist & Lanfair Ave's <br />III -C <br />UR7-97-18-DS <br />j 899 <br />817 / <br />414 i <br />Between Laconia & Barber St's , between Bayfront <br />Terrace and Rolling Hills (Lansdowne) <br />III -D <br />LT" -97 -19 <br />-DS <br />698 1 <br />639 <br />232 <br />East of Laconia St., between Clearmont & Capon j <br />o u"LR . <br />III -E UW -97 -20 -DS 735 654 276 West of Laconia St, between Granduer & Gladiola <br />Avenue's <br />Total 39753 3,354 /19545 South of CR 512 and SW of Barber Street <br />Engineering design has been completed by the staff of the Department of Utility Services for Phase III -C and we are <br />now ready to begin the assessment process associated with this project, as outlined herein. A summary assessment <br />roll for Phase III -C is attached (Attachment 4). The full assessment roll is on file in the commission office. This <br />Project is to be paid through the assessment of property owners along the proposed water line route. Financing will <br />be from the assessment fund 473, account number 473-000-169491. If needed, inter -fund borrowing will be <br />available from the capacity fee fund 472. The combined estimated project cost and amount to be assessed for both <br />Phases III -B and III -C is $ 3,285,521.48 which is a revised cost that is less than the cost of constructing Phases III -B <br />and III -C separately. (Attachment -5). For Phase III -C the estimated cost per square foot is $0.221673 (rounded). <br />The actual assessed cost, as with any project will be determined based on actual competitive bid prices. <br />On June 22, 2001, a letter was sent to the City Manager, of the City of Sebastian, with a copy of a draft agenda item, <br />summary assessment roll and a map of the project area (Attachment 6). <br />July 24, 2001 <br />27 <br />BI i #' b <br />
The URL can be used to link to this page
Your browser does not support the video tag.