r <br />• <br />construction to Weller Pool Constructors, Inc. in the amount of <br />$2,061,967. At the February 12, 2002 Board of County Commissioners <br />meeting, the Board approved Change Order No. 1, whereby reducing <br />the contract amount by $404 993.76, to allow for sales tax savings <br />for direct purchase of materials. At the April 23, 2002 Board of <br />County Commissioners meeting, the Board approved Change Order No. <br />2, whereby increasing the contract amount by $225,206.35 to allow <br />for addition of Bulkhead and Geothermal Heating for the Competition <br />Pool and allow for sales tax savings for direct purchase of <br />materials. <br />Now, there are two new items of approval for Change Order No. 3 as <br />outlined below: <br />1. Direct purchase by Indian River County of equipment reduces <br />the contract by $139,805.07 and saves $9146.13 in sales tax. <br />2. Currently, the Activity Pool is proposed to be heated by gas <br />heat, which is included in the existing contract. Gas heat is <br />relatively inexpensive to install but has a high operating <br />budget. (Installation cost -$12,307, operating cost approx- <br />imately $22,000 per season) Geothermal heating system costs <br />more than the gas heating system to install, but has a much <br />lower operating cost. (Installation cost -$35,904, operating <br />cost approximately $4,000 per season) <br />The additional cost for installation of a Geothermal Heating <br />System for the Activity Pool (additional $23,597) in lieu of <br />the Gas Heating System is expected to pay for itself in less <br />than two years due to much lower yearly operating costs. (See <br />attached heating analysis) <br />If changing the Activity Pool Heating System from gas to <br />geothermal is considered, there are two methods that this <br />could be done. <br />a) <br />The "Rough -in" for the geothermal heating in the <br />Activity Pool could be done now and would cost <br />$10,809. Eliminating the gas heating system would <br />save $12,307, thus a reduction in contract of $1,498. <br />But, at a later time, when money is available, the <br />remaining installation of the geothermal heat system <br />would be performed. (Additional cost would be $12,788 <br />plus remobilization charge [possibly $5,000] and any <br />additional cost increases at that time.) <br />b) The complete geothermal heating system could be <br />installed now and be ready for the pool opening. The <br />additional cost of $23,597 is partially offset by the <br />$9,146.13 sales tax savings, which leaves a deficit <br />of $10,120.98 from the budget since $4,329.89 is <br />still available in the original budget. <br />April 10, 2001 BCC Approved Budget <br />$5,800,000.00 <br />Nov. 20, 2001/ BCC Approved <br />Weller - $ 2,061,967 <br />Proctor $ 3,352,892 <br />County Costs $ 358,000 <br />Total Cost $5,772,859.00 <br />August 13, 2002 <br />53 <br />fly <br />Un <br />3 7 3- <br />