My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/17/2002
CBCC
>
Meetings
>
2000's
>
2002
>
9/17/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 12:59:39 PM
Creation date
9/25/2015 4:47:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
09/17/2002
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
2561
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Those remaining improvements have not yet been completed as required under the <br />existing contract. The developer wishes to extend the contract and the letter of credit. <br />Because the security guaranteeing the improvements will expire on September 26, 2002, <br />the Board must act now to ensure that the security will either be pulled or extended. <br />ANALYSIS: <br />The LDRs allow for subdivision improvements to be bonded out for final plat approval. <br />In this instance, the applicant has bonded for final plat approval, but has not been able to <br />complete the remaining improvements in the timeframe specified in the contract for <br />construction. <br />Staff has no objection to the Board authorizing the developer up to one more year, with <br />no subsequent extensions, to complete the remaining improvements. As of the date of this <br />report, however, the developer has not submitted the documents necessary to extend the <br />contract completion date and extend the letter of credit. To ensure completion of the <br />required improvements, the Board needs to authorize staff to pull the existing letter of <br />credit by adopting the attached resolution. To accommodate the developer's desire to <br />extend the completion date and offer substitute (extended) security, the Board should also <br />authorize such extensions if the developer provides the necessary items for the contract <br />date extension and letter -of -credit substitution (or amendment) on or before September <br />23, 2002. <br />RECOMMENDATION: <br />Staff recommends that the Board of County Commissioners: <br />1. Adopt the attached resolution authorizing staff to pull the existing letter of <br />credit unless the conditions of item #2 (below) are met. <br />2• Approve an extended improvement completion date of up to one year, <br />authorize the chairman to sign a modification of contract for construction <br />completion .date and accept a substitute letter of credit in an amount <br />acceptable to the County Engineer in lieu of pulling the existing letter of <br />credit referenced above, if the developer provides to staff the items <br />necessary for such an extension and letter of credit substitution or <br />amendment on or before September 23, 2002. <br />ATTACHMENTS: <br />1. Location Map <br />2. Existing Letter of Credit (copy) <br />3. Resolution to Pull the Existing Letter of Credit <br />4. Modification of Contract for Construction <br />September 17, 2002 <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.