The applicant is proposing to construct a 1080 megawatt electrical power plant which will use <br /> natural gas as a fuel source. The plant will consist of four heat recovery steam generators , two <br /> support buildings, cooling towers , and a variety of other support structures and equipment . In <br /> contrast to the Vero Beach Power Plant, the generators at the Calpine facility will not be housed <br /> within a building, but will be located outside on concrete pads. The new facility will connect to, the <br /> existing 230 KV transmission lines that run along the west side of I-95 via overhead lines . The plant <br /> is to provide wholesale power to customers via the electrical grid . A new natural gas line is <br /> proposed to be constructed across the state, through St . Lucie County, and will connect to the <br /> Calpine site from the west. If all local and state approvals are obtained, the applicant is anticipating <br /> the plant going into service in 2004 . <br /> PLANNING: AND ZONING COMNIISSlOIS ACTION <br /> At its regular meeting of August 9th, 2001 , the Planning and Zoning Commission voted <br /> unanimously (6-0) to recommend that the Board of County Commissioners grant special exception <br /> use and conceptual site plan approval , with conditions . Those recommended conditions would <br /> require changes to the buffering along two sections of the west property line, adjacent to 1-95 . More <br /> details on the buffering is included in the aesthetics analysis section of this report. The staff' s <br /> recommendation differs slightly from the Planning and Zoning Commission ' s on the amount of plant <br /> material required in one of the buffer sections along the west property line. <br /> The Board of County Commissioners is to approve, approve with conditions , or deny the special <br /> exception use request. Pursuant to Section 971 . 05 of the land development regulations (LDRs), the <br /> Planning and Zoning Commission is to consider the appropriateness of the requested use for the <br /> subject site and surrounding area. The county may attach conditions and safeguards necessary to <br /> mitigate impacts and to ensure compatibility of the use with the surrounding area. <br /> If the conceptual site plan and special exception use are approved, the applicant will submit a major <br /> ("final") site plan application at a later date. That application will be reviewed by the Planning and <br /> Zoning Commission . <br /> ANALYSIS • <br /> 1 . Size of Site : 50 . 5 acres or 2 , 199, 780 sq . ft. <br /> 2 . Zoning Classification : A- 1 , Agricultural (up to 1 unit,5 acres) <br /> 3 . Land Use Designation : AG- 1 , Agricultural ( up to 1 unit/5 acres ) <br /> 4 . Building Area Proposed : 17, 000 sq . ft . <br /> Note : There is a substantial amount of unenclosed equipment area. <br /> 5. Phasing : The applicant is proposing to construct the improvements in a single phase . <br /> 6. Impervious Area : 19 . 70 acres or 857 , 914 sq . ft . <br /> 7. Open Space : Required : 60% <br /> Proposed : 61 % <br /> 8 . Traffic Circulation : The site is located at the south terminus of 74th Avenue, the road <br /> which will provide access to the site. The applicant will extend the 74th Avenue pavement <br /> SEPTEMBER 18 ' 2001 <br /> Oji ' <br /> - 60 - <br />