My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/18/2001
CBCC
>
Meetings
>
2000's
>
2001
>
9/18/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 9:44:56 PM
Creation date
9/25/2015 4:28:03 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
09/18/2001
Archived Roll/Disk#
2545
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s� <br /> maximum use limit . The water will be recycled over 20 times and then eventually <br /> evaporated through the towers . A fogging analysis was done and there is no significant risk <br /> for I - 95 . The mechanical draft cooling towers are fan driven and are about 50 ' in height . <br /> There are 2 banks of these towers on the north and the south side of the project, about 9 <br /> towers . <br /> Chairman Ginn wanted to see the noise emissions meet residential requirements , and <br /> Director Keating noted that because the property to the north is zoned agricultural , the <br /> requirements are that they meet the agricultural requirements . <br /> Mr . Murphy noted - that the St . Lucie County noise regulations are pretty much the <br /> same as the Indian River County regulations . <br /> Brian Heady commented that there had been no response to his question regarding <br /> jobs , and Chairman Ginn responded that the presentation had included information regarding <br /> the jobs . <br /> MOTION WAS MADE by Commissioner Tippin, <br /> SECONDED by Commissioner Macht , to approve <br /> staff, s recommendation . <br /> Commissioner Macht noted that this project will bring an added economic benefit to <br /> the County with approximately 30 jobs for local residents . <br /> Commissioner Stanbridge commented that Calpine has worked cooperatively with the <br /> County for over 3 years on this project . <br /> SEPTEMBER 18 , 2001 <br /> 1 Pb 1 5 9 I <br /> - 73 - <br /> k. x+ „y w+ 'rc•'* 1�'S r„�2 y x ; f <br /> ;- <br /> i <br /> V. <br />
The URL can be used to link to this page
Your browser does not support the video tag.