My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/23/2003
CBCC
>
Meetings
>
2000's
>
2003
>
9/23/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2021 3:00:16 PM
Creation date
9/25/2015 4:53:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
09/23/2003
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
2573
Book and Page
125, 900-959
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />(CLERK'S NOTF• The presentation notebook entitled Indian River County <br />Administration Complex Programming Document Final Document September <br />16, 2003, an important part of this presentation, is on file with the backup for <br />this meeting.) <br />Chairman Macht announced that this item was moved forward to be heard directly <br />after the public hearings because of time constraints. (CLERK' S OTE • The Chairman <br />reconvened the meeting at 11:46 a.m. following Item 9.A.2. with all members present except <br />Commissioner Adams. Commissioner Adams was not present during this presentation and <br />discussion but returned just as the Board voted.) <br />General Services Director Tom Frame gave a brief review of how we got here as a <br />result of the Space Needs Committee's research and recommendation. We now have verbal <br />agreements with the City to obtain the needed property with two Attorneys working out the <br />contract details. After the presentation, the Board will be asked to authorize the architect <br />to proceed with the remaining portion of the contract, the design and construction. He asked <br />Steve Blum to come forward to introduce the architectural team to make their presentation <br />of the work thus far accomplished. <br />New Administration Building Project Manager Steve Blum noted that the last several <br />months have been a very interesting process. They have validated the findings of the Space <br />Needs Committee; have gotten to know the department heads have interviewed, interviewed <br />again, and reviewed and reviewed again. We think we now have a validated program about <br />which we can be proud. This is the most important phase of the project and we look forward <br />to the rest of the project and giving the County a very fine building. He introduced Tony <br />Donadio, the prime architect, and Young Song, the associate architect whose film has taken <br />the lead on this portion of the work and who will make the presentation. <br />September 23, 2003 <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.