Laserfiche WebLink
• <br />DOCUMENTS WILL BE ON FILE <br />IN THE OFFICE OF THE CLERK TO THE BOARD <br />WHEN EXECUTED AND RECEIV ED (r/ - <br />11.G.3. HUMANE SOCIETY OF VERO BEACH AND INDIAN <br />RIVER COUNTY, INC. - DEVELOPER'S AGREEMENT <br />The Board reviewed a Memorandum of August 26, 2002: <br />TO: James Chandler, County Administrator <br />FROM: James W. Davis, P E , Public Works Director <br />SUBJECT: Developer's Agreement — Humane Society of Vero Beach and Indian River <br />County <br />DATE: August 26, 2002 <br />DESCRIPTION AND CONDITIONS <br />The Humane Society is constructing a new facility on 77th Street between 58th Avenue and 66th <br />Avenue. A joint effort to pave 77th Street along this one -mile length was tentatively considered by <br />the Board of County Commissioners on January 16, 2001. Since that time, the Humane Society has <br />contracted with a civil engineering firm, Knight, McGuire & Associates, Inc of Vero Beach to <br />design and obtain three competitive bids for the paving. The attached developer's agreement has <br />also been prepared by staff to establish the funding responsibilities, project management and <br />engineering, stormwater treatment, and miscellaneous items. <br />ALTERNATIVES AND ANALYSIS <br />The attached Developer's Agreement provides for the Humane Society providing project <br />management and a portion of the stormwater treatment on their 38 -acre site. The County will fund <br />the engineering design costs of $28,500.00 and approximately $460,000.00 of the construction costs <br />A proposed mining operation south of 77th Street will pay $36,467.00 of the paving costs. A <br />payment bond and performance bond will cost $6,040.00 if the County wants them included. The <br />total County cost with bonds will be $494 540.00. Cathco of Vero Beach will be the contractor for <br />the Humane Society. The County Road and Bridge Division will clear the right-of-way. The County <br />Traffic Engineering Division will stripe and sign the new paved road. The County Annual Paving <br />Contractor will supply and install the asphalt. <br />The alternatives presented are as follows: <br />Alternative No. 1—Approve the Developer's Agreement with the option of the contractor providing <br />a Performance Bond and Payment Bond at additional cost of $6,040.00. <br />Alternative No. 2 — Deny the approval of the Developer's Agreement. <br />September 3, 2002 <br />117 <br />Eli <br />• <br />