My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/21/2014
CBCC
>
Meetings
>
2010's
>
2014
>
01/21/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 3:55:00 PM
Creation date
9/25/2015 5:37:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/22/2014
Meeting Body
Board of County Commissioners
Book and Page
239
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Indian River County 1 Impact Fee Update Study <br />Table C-8 <br />CEI Cost Adjustment — County Roads <br />1) CEI cost is estimated at 9% of construction cost bait -den recent TIF studies in <br />Table C-16 (Item a). <br />(2) Source: Appendix C, Table C-17 (Items c and d) <br />(3) CEI cost per lane mile (Item 1) multiplied by the,,associatednsection design weight <br />,mss.. <br />(Item 2) for each design type and added together. <br />State Roadways <br />The CEI cost factor for state roads was estimatedas a pe cr entage <br />per lane mile. This factor was determined through a review of the <br />ratios for state road unit costs in<•.prevev`iously completed impact <br />Florida. For state roadways, the CEI=.facto"rs ranged frompercent to 17 percent, with a <br />weighted average of 111percent. For pur:.poses ofsthis.updatestudy, the CEI cost for state <br />st\"��; <br />roads was calculatedll percent of the construction cgstper lane mile (see Table C-16 for <br />additional information). <br />• <br />of thSconstruction cost <br />CEI -to -construction cost <br />fee studies throughout <br />Road Type <br />CE Cost Adjustment State Roads <br />CEI Cost per Lane <br />Mile(1) <br />Section Design <br />Distribution(2) <br />Weighted CEI = <br />Cost per Lane <br />Mile(3) <br />Urban Design <br />$220,000 <br />34% <br />$75,000 <br />Rural Design <br />$183,000 <br />66% <br />$121,000 <br />Weighted Average CEI Cost per Lane Mile <br />$196,000 <br />1) CEI cost is estimated at 11% of construction cost based on recent TIF studies in <br />Nigr <br />Table C-16 (Item b). <br />(2) Source: Appendix C, Table C-17 (Items c and d) <br />(3) CEI cost per lane mile (Item 1) multiplied by the associated section design weight <br />(Item 2) for each design type and added together. <br />Tindale -Oliver & Associates, Inc. <br />January 2014 <br />Indian River County . <br />C-7 Impact Fee Update Study <br />Road Type <br />CEI Costper.Lane <br />Mlle(1) <br />Section Design <br />Distribution �2 <br />Weighted CEI <br />Cost per Lane <br />(3) <br />Mile <br />Urban Design <br />$162,000 <br />34% <br />$55,000 <br />Rural Design <br />$134,000 <br />66% <br />$88,000 <br />Weighted Average CEI Cost <br />per Lane Mile <br />$143;000 <br />1) CEI cost is estimated at 9% of construction cost bait -den recent TIF studies in <br />Table C-16 (Item a). <br />(2) Source: Appendix C, Table C-17 (Items c and d) <br />(3) CEI cost per lane mile (Item 1) multiplied by the,,associatednsection design weight <br />,mss.. <br />(Item 2) for each design type and added together. <br />State Roadways <br />The CEI cost factor for state roads was estimatedas a pe cr entage <br />per lane mile. This factor was determined through a review of the <br />ratios for state road unit costs in<•.prevev`iously completed impact <br />Florida. For state roadways, the CEI=.facto"rs ranged frompercent to 17 percent, with a <br />weighted average of 111percent. For pur:.poses ofsthis.updatestudy, the CEI cost for state <br />st\"��; <br />roads was calculatedll percent of the construction cgstper lane mile (see Table C-16 for <br />additional information). <br />• <br />of thSconstruction cost <br />CEI -to -construction cost <br />fee studies throughout <br />Road Type <br />CE Cost Adjustment State Roads <br />CEI Cost per Lane <br />Mile(1) <br />Section Design <br />Distribution(2) <br />Weighted CEI = <br />Cost per Lane <br />Mile(3) <br />Urban Design <br />$220,000 <br />34% <br />$75,000 <br />Rural Design <br />$183,000 <br />66% <br />$121,000 <br />Weighted Average CEI Cost per Lane Mile <br />$196,000 <br />1) CEI cost is estimated at 11% of construction cost based on recent TIF studies in <br />Nigr <br />Table C-16 (Item b). <br />(2) Source: Appendix C, Table C-17 (Items c and d) <br />(3) CEI cost per lane mile (Item 1) multiplied by the associated section design weight <br />(Item 2) for each design type and added together. <br />Tindale -Oliver & Associates, Inc. <br />January 2014 <br />Indian River County . <br />C-7 Impact Fee Update Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.