Laserfiche WebLink
3.8 EXOTIC ELIMINATION <br />A. INTER -CONSTRUCTION EXOTIC ELIMINATION PERIOD: Eliminate exotics from <br />all planted areas during the estimated 6 -month construction period During this <br />inter -construction exotic elimination period, destroy all exotic plants in landscaped <br />areas. As a minimum, perform exotic elimination monthly. Kill all exotics using <br />methods approved by both the OWNER and St. Johns River Water Management <br />District (SJRWMD) (i.e. hand remove or lightly spray with SJRWMD approved <br />herbicides). Take special care to not disturb birds, nests, or other wildlife. <br />B. Beginning on the date of final acceptance of all landscaping by the OWNER2, <br />destroy all existing and future exotic plants on the project site for a period of five <br />years. As a minimum, perform exotic elimination monthly. Kill all exotics at the site <br />using methods approved by both the OWNER and St. Johns River Water <br />Management District (SJRWMD) (i.e. hand remove or lightly spray with SJRWMD <br />approved herbicides) and keep the entire project site free of exotics. Take special <br />care to not disturb birds, nests, or other wildlife. <br />C. In addition to cattails and other plants normally considered to be exotics by the <br />industry all of the plants in Exhibit 2, 'Upland and Wetland Invasive Exotics" shall <br />be eliminated and removed from the planted area and the wetland edge. <br />+ + END OF SECTION + + <br />• <br />2 This date will probably be upon completion of major site construction activities by Close Construction <br />Last revised 11-18-2013 02240-7 OSPREY MARSH <br />F:\Public Works\KedhM\Stormwater Projects\PC South Construction Mork Orders\GK EnvironmentaIWmendment 1\Exhibit 1 Scope <br />of Services - 12-17-2013.doc <br />68 <br />