My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/11/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
02/11/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 4:25:37 PM
Creation date
9/25/2015 5:41:51 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/11/2014
Meeting Body
Board of County Commissioners
Book and Page
244
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Mr.`Himanshu H. Mehta,.P.E. <br />January. 27, 2014 <br />Page 2' <br />■ Annual Statement of Compliance, <br />■ Annual Operating.Report, • <br />■ Annual Emission Fee, <br />■ Results of an annual flare visible emissions test. <br />IRC SWDD is.also•required to perform tniscellaneoussampling and monitoring activities in <br />compliance.withthesolidwaste•operationspetiiitandthe-MuItJ-SectorGenericPermit.(MSGP)for <br />stormwater. discharger <br />This project included providing the required perrnit compliance andinonitering-services under the <br />follbWing tasks: <br />• ■ Task 1.0 -Project Quality Management <br />■ Task -2.0 - Semi -Annual Water 4Qpality Sampling and Reporting, <br />■ Task 3.0.- Title V.Reporting Permit Compliance and.Repo_rting, <br />■ Task 4.0 --General:Technical and Miscellaneous Permit Cornpliarice.Monitoririg and Reporting <br />TASK 1.0 PROJECT QUALITY MANAGEMENT• <br />Activities performed under this task consisted ofthose.generally administrative functions required • <br />to assure that the.project remained on schedule, within budget,;andthat-the quality -of the work <br />. products defined within .this .scope was consistent with CDM Sniith s standards and IRC SWDD's <br />expectations, <br />-CDM-Sinith coordinated with IRC SWDD staff for project planning. Preparation of invoices and <br />.project administration was also performed under this -task. <br />TASK.Z.O--SEMI-ANNUAL WATER QUALITY SAMPLING.AND REPORTING • <br />Under this task, CRM Smith assisted IRC SWDD with the semi-annual•water quality sampling, <br />monitoring, and reporting inaccordance with Chapter 62-701.510;. F.A.C. The January 2013 <br />sampling -event was performed in accordance with the Monitoring Plan Implementation Schedule <br />(MPIS) of Permit Nos SC31-0128769-019 and S031-0128769-020 The July 2013 sampling event. <br />• was conducted in accordance with the March.7; 2011 MPIS, as modified. by Honda Departirient of <br />JJ1392.doat <br />110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.