My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/11/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
02/11/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 4:25:37 PM
Creation date
9/25/2015 5:41:51 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/11/2014
Meeting Body
Board of County Commissioners
Book and Page
244
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Mr: Himanshu H. Mehta; P.E. <br />January 27, 2014 <br />Page 3 <br />Environmental Protection (FDEP) correspondence regarding the.perinit renewal application for the <br />Constructionand Debris landfill at the IRC. facility.entitled."Second Request for Additional <br />Information; Permit Renewal Application SO314)128769=021" dated July 5, 2012 and the response <br />by CDM Srnith on behalf of IRC dated July 16, 2012:: <br />CDM Smith contracted with Ideal TechService Int, (ITS) to performthe:groundwater, surface <br />water, and leachate sarripl ng. CDM Smith/ITS performed the January 2013 and July 2013 semi= <br />annual sampling:of the Class and construction and demolition(C&D) debris landfill groundwater <br />monitor wells -for the list of semi-annual groundwater parameters ofthe MPIS; <br />CDM Smith/ITS:collected•water level data:for the groundwater monitor.wells and staff gauges prior <br />to the samplinwevents,:CDM Smith/ITS also performed the. 2013 semi-annual (January and July) <br />sampling of the two.surface water sites`for analysis of the list of semi-annual surface water <br />parameters and annual leachate sampling.fr-om the leachate -monitoring sites foranaiysis of the list <br />of annual leachate paraineters. <br />CDM • Smith assisted IRC SWDD in.coordinating the analytical testing activities with !RC'S laboratory <br />(Environmental Conservation Laboratories), notified FDEP.=prior Co sampling:as.requited by the. <br />MPIS, reviewed and evaluated the analytical test results, and prepared the semi-annual reports. The <br />January 2013 Water Quality. Sampling Event report -was submitted.to.FDEP-on March 13, 2.013.and <br />the July 2013 Water Quality Sampling Event report was submitted to FDEP on.september 27, 2013, <br />TASK $.0 - TITLE V PERMIT COMPLIANCE AND REPORTING <br />The Title V Alit Operation. Petri* .(Permit N� 0610015 -004 -AV) *'We IRC Landfill Contains <br />monitoring and reporting requirements related to the landfill gas collection and control system. In <br />`accordance with the Title V permit, CDM Smith assisted IRC SW DD, asdesc_ ribed below, in fulfilling_ <br />:all air permit;requirements and conditions within the required regulatory timeframes. <br />Statement of Compliance. <br />CDM Smith prepared and submitted the Statement of Compliance for the reporting period of <br />January through December of 2012 for the IRC Landfill to FDEP on February 26, 2013 in accordance <br />with Rule 62-213.440(3)(a)(2), F:A.C. <br />111392Aocx <br />111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.