Laserfiche WebLink
• <br />Mr: Hirnanshu H. Mehta, .P:g. <br />January 27, 2014 <br />Page 4 <br />Annual Operating Report <br />CDM Smith prepared and; submitted the Electronic Annual Operating Reports for the 2012 <br />reporting year -for the IRC Landfill to FDEP on March 20, 2013. <br />Arinual Emissioris Fee <br />CDM .Smith,preparedand submitted the Title V Fee Holiday Discount Forms for the 2012calendar <br />year emissions to:FDEP February 22, 2013. <br />Visible Emissions -Testing <br />CDM Smithcontracted with TRCEnvironnientaiCorporation to perform the 2013 annual visible <br />ernissions tests in order to determine the opacity of the flare: The 2013 visible emissions test was <br />performed on April 5, 2013 and submitted tb FDEP on April 22 2013. <br />• - <br />TASK 4.0 - GENERAL TECHNICAL AND MISCELLANEOUS :PERMIT COMPLIANCE ASSISTANCE <br />CDM Smith providedgeneral technical and permit compliance assistance to IRC.SWDD staff onan <br />as needed basis:Under this task, CDM Smith monitored the landfill gas migration monitoring wells <br />located at the !RC Landfill Site boundary, as well as enclosed structures located on site, and <br />submitted reports of the results to:FDEP on.a quarterly basis. The reports were submitted :toFDEP• <br />on April: 3.2013,:June 19; 2013, September 17,.2013,:and December 13, 2013. <br />CDM Smith provided general technical assistance with regard t� the -Multi -Sector GenericPermit <br />(MSGP)1foc stormwater discharge. CDM Smith coordinated w'th FDEP staff to confirm that that Year <br />4:(2013) monitoring was not required. A.'Low Concentration Waiver" will be submitted to FDEP <br />for the Year 4 monitoring in lieu of:monitoring:data. <br />CDM. Smith also submitted a request to FDEP on August 13, 2013 to modify the monitoring plan <br />implementation schedule (MPIS) to eliminate the leachate monitoring. pursuant to the -rule change <br />outlined in 62-701 FAC and update the MPIS to reflect changes in, the water quality monitoring_ <br />program associated with the construction of Class I landfill, Segment III, approval to integrate <br />elements of the evaluation/assessment monitoring.for the C=5 Canal into the routine monitoring <br />program as proposed by CDM Smith and other revisions pude to the monitoring program as <br />described in correspondence from FDEP dated. July 5, 2012 regarding the Technical Report <br />prepared byCDM Smith and the CDM Smith response dated July 16, 2012. FDEP is processing the-. <br />request. <br />y1392.docx <br />0 <br />112 <br />