Laserfiche WebLink
9 Sullivan <br />Corp. <br />GENERAL CONTRACTOR <br />December 9, 2013 <br />Mr. Raj Singh <br />Atkins <br />Page 2 <br />Re: West Regional WWTP <br />Clarifiers Rehabilitation PCO No. 04B <br />The exterior of the clarifier structures will be recoated as described in the attached <br />proposal from Exceletech The cracks on the sides of the clarifiers will be covered with <br />the same coating material, but no crack repair is included in this proposal. Painting of <br />the small building as described in the quotation from Exceletech is included. <br />Our quotation for this extra work is the Lump Sum Amount of $112,267 00. The <br />breakdown of our quotation is as follows. <br />_Remove existing bridge (32 MH @ $40.00/MH) $ 1,280.00 <br />•New access bridge (Dixie Metals) 7,192.28 <br />Install New Access Bridge (64 MH @ $40.00/MH) 2,560.00 <br />New fasteners, all -thread & epoxy for mounting bridge 500.00 <br />Misc. piping materials for water line on Bridge 200.00 <br />Reinstall water line (4 MH @ 40 00/MH) 160.00 <br />New rubber squeegees on skimmer arms (Walker Process) 3,092.30 <br />Install rubbers squeegees on skimmer arms (16 MH @ 40.00/MH) 640.00 <br />Remove & reinstall existing brass squeegees on rake. arms (64 MH@ 40.00) 2,560.00 <br />Supervision (40 MH @ 75.Q0/MH) 3,000.00 <br />Crane (1 Week Cca 1,500/Week) 1,500.00 <br />Subtotal $22,684.58 <br />15% Mark-Up 3,402.69 <br />Total R.J. Sullivan Corp. Work $26,087.27. <br />Electrical. work (Paragon Electric) 2,108.00 <br />Blast & Paint Existing Clarifier Mechanisms (Exceletech) 63,400.00 <br />Repair crack at top of wall of Clarifier #1 (Exceletech Allowance) 300.00 <br />Paint Chlorine Building (Exceletech) 2,600.00 <br />Paint Exterior Concrete Walls of Two Clarifiers (Exceletech) 10,600.00 <br />Subtotal <br />$79,008.00 <br />5% Mark-up 4 3.950.40 <br />Subtotal' $82,958.40 <br />2001 N.W. 22nd Street • Pompano Beach, FL 33069 <br />Phone 954-975-0388 • Fax 954-975-3333 <br />123 <br />