Laserfiche WebLink
extension on the bid from Barth, and that their response was a pledge that their bid price would <br /> honored until July 2 , 2011 . <br /> Kevin Vann, CDM, using a PowerPoint presentation (on file) provided details and <br /> visuals of the site, design, and layout of the proposed facility. <br /> Eric Grotke, CDM, continued the above PowerPoint presentation (on file) , by reviewing <br /> the schedule and estimated construction costs for the project . He pointed out that with the "flat" <br /> on-grade approach, construction time would be shortened by about six months , which would <br /> create a cost savings . He thereafter provided the pros and cons of the compactor alternative , and <br /> believed that with the construction of this new conceptual design, and the permitting, and re- <br /> bidding, the completion date would be June 2012 . <br /> Questions and discussion ensued as Commissioners inquired about yard waste <br /> disposition, modifications to the contract, and the advantages of the project. <br /> MOTION WAS MADE by Vice Chairman Wheeler, <br /> SECONDED by Commissioner Flescher, to not have <br /> Camp Dresser and McKee (CDM) prepare a Feasibility <br /> Report as approved on May 3 , 2011 , and to direct CDM to <br /> come back with a proposal on the new compactor <br /> conceptual design. <br /> Attorney Polackwich, in response to Commissioner Flescher ' s concerns , noted that staff <br /> would be required to start over with a new bid . <br /> Todd Westover, Division Manager, Republic Services d/b/a Treasure Coast Refuse , <br /> affirmed that compaction creates less trips , and that maintenance coverage rates on compactors <br /> should be reasonable . <br /> May 24 , 2011 2 <br />