Laserfiche WebLink
the sign package from staff. The sign package must <br />comply with County Corridor Plan requirements and <br />demonstrate a consistent aesthetic theme for the entire <br />project. b. Provide a final design, acceptable to Traffic <br />Engineering and Metropolitan Planning Organization <br />(MPO) staff, for the project transit stops. c. Provide a <br />final design, acceptable to Engineering, for stormwater <br />capacity for run-off from adjacent public roads. <br />6. Prior to the issuance of the first certificate of <br />completion for any preliminary PD plan within any sub - <br />phase of Phase I, the applicant shall: a. Complete or bond <br />out the sidewalk segment on 49 h Street and 58th Avenue <br />adjacent to Phase I. b. Pave that portion of 53rd Street <br />from 58th Avenue to the western project driveway. <br />c. Complete all site related traffic improvements depicted <br />on the preliminary PD plan and listed in section 13 of the <br />staff report that serve that portion of Phase I or sub -phase <br />of Phase I. <br />7. Prior to issuance of a certificate of completion for <br />Phase lb, the applicant shall pave that portion of 49th <br />Street adjacent to Phase lb as shown on the preliminary <br />PD plan. <br />8. Prior to or via the final plat approval for Phase I, the <br />applicant shall dedicate the 120' right of—way for 53rd <br />Street to the County, subject to the terms of a developer's <br />agreement. <br />9. Prior to the issuance of a certificate of completion for <br />Phase II, the applicant shall complete all site -related traffic <br />improvements required to serve Phase II, as identified by <br />August 20, 2013 36 <br />Bk 144 PG 214 <br />