Laserfiche WebLink
arbitration or other dispute resolution costs ) 1 . all persons on the Site or who may <br /> arising out of or relating to any claim or action , be affected by the Work; <br /> legal or equitable , brought by any such owner <br /> or occupant against OWNER, ENGINEER, or 2 . all the Work and materials and equip- <br /> any other party indemnified hereunder to the ment to be incorporated therein , whether in <br /> extent caused by or based upon storage on or off the Site; and <br /> CONTRACTOR's performance of the Work. <br /> 3 . other property at the Site or adjacent <br /> B . Removal of Debris During Performance of the thereto , including trees, shrubs , lawns , walks , <br /> Work. During the progress of the Work CONTRAC- pavements , roadways , structures , utilities , and <br /> TOR shall keep the Site and other areas free from Underground Facilities not designated for <br /> accumulations of waste materials , rubbish , and other removal , relocation , or replacement in the <br /> debris . Removal and disposal of such waste materi- course of construction , <br /> als , rubbish , and other debris shall conform to applica- <br /> ble Laws and Regulations . B . CONTRACTOR shall comply with all applica- <br /> ble Laws and Regulations relating to the safety of <br /> C . Cleaning: Prior to Substantial Completion of persons or property, or to the protection of persons or <br /> the Work CONTRACTOR shall clean the Site and property from damage , injury, or loss ; and shall erect <br /> make it ready for utilization by OWNER. At the com- and maintain all necessary safeguards for such safety <br /> pletion of the Work CONTRACTOR shall remove from and protection . CONTRACTOR shall notify owners of <br /> the Site all tools , appliances , construction equipment adjacent property and of Underground Facilities and <br /> and machinery, and surplus materials and shall other utility owners when prosecution of the Work may <br /> restore to original condition all property not designated affect them , and shall cooperate with them in <br /> the <br /> for alteration by the Contract Documents , protection , removal , relocation , and replacement of <br /> their property. All damage, injury, or loss to any <br /> D . Loading Structures: CONTRACTOR shall not property referred to in paragraph 6. 13 .A.2 or 6 . 13 .A.3 <br /> load nor permit any part of any structure to be loaded caused , directly or indirectly, in whole or in part, <br /> by <br /> in any manner that will endanger the structure, nor CONTRACTOR, any Subcontractor, Supplier, or any <br /> shall CONTRACTOR subject any part of the Work or other individual or entity directly or indirectly employed <br /> adjacent property to stresses or pressures that will by any of them to perform any of the Work, or anyone <br /> endanger it. for whose acts any of them may be liable, shall be <br /> remedied by CONTRACTOR (except damage or loss <br /> 6 . 12 Record Documents attributable to the fault of Drawings or Specifications <br /> or to the acts or omissions of OWNER or ENGINEER <br /> A. CONTRACTOR shall maintain in a safe place or ENGINEER's Consultant, or anyone employed by <br /> at the Site one record copy of all Drawings , Specifica- any of them , or anyone for whose acts any of them <br /> tions , Addenda, Written Amendments, Change may be liable, and not attributable, directly or <br /> Orders , Work Change Directives, Field Orders, and indirectly, in whole or in part, to the fault or negligence <br /> written interpretations and clarifications in good order of CONTRACTOR or any Subcontractor, Supplier, or <br /> and annotated to show changes made during other individual or entity directly or indirectly employed <br /> construction . These record documents together with by any of them ) . CONTRACTOR's duties and <br /> all approved Samples and a counterpart of all responsibilities for safety and for protection of the <br /> approved Shop Drawings will be available to ENGI- Work shall continue until such time as all the Work is <br /> NEER for reference . Upon completion of the Work, completed and ENGINEER has issued a notice to <br /> these record documents , Samples , and Shop OWNER and CONTRACTOR in accordance with <br /> Drawings will be delivered to ENGINEER for OWNER. paragraph 14 .07 . 6 that the Work is acceptable <br /> (except as otherwise expressly provided in connection <br /> 6 . 13 Safety and Protection with Substantial Completion ) , <br /> A. CONTRACTOR shall be solely responsible 6 . 14 Safety Representative <br /> for initiating , maintaining and supervising all safety <br /> precautions and programs in connection with the A. CONTRACTOR shall designate a qualified <br /> Work. CONTRACTOR shall take all necessary and experienced safety representative at the Site <br /> precautions for the safety of, and shall provide the whose duties and responsibilities shall be the <br /> necessary protection to prevent damage, injury or loss prevention of accidents and the maintaining and <br /> to : supervising of safety precautions and programs . <br /> 00700 - General Conditions REV 04-07 .doc <br /> 00700 - 23 <br /> F:\Engineering\Capital Projects\0541 20th Ave Widening, 25th St SW to 21st St SW\Contract Documents\00700 - Gcne l Conditions REV 04-07.doc <br />