My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-002
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2016 10:35:44 AM
Creation date
9/30/2015 3:32:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/05/2010
Control Number
2010-002
Agenda Item Number
8.M.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Road Widening
Area
20th Avenue SW fropm 25th Street SW to 21st St. SW
Bid Number
2010014
Supplemental fields
SmeadsoftID
8076
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 . 15 Hazard Communication Programs approval of the pertinent submittal will be at the sole <br /> expense and responsibility of CONTRACTOR. <br /> A. CONTRACTOR shall be responsible for <br /> coordinating any exchange of material safety data D . Submittal Procedures <br /> sheets or other hazard communication information <br /> required to be made available to or exchanged be- 1 . Before submitting each Shop <br /> tween or among employers at the Site in accordance Drawing or Sample, CONTRACTOR shall have <br /> with Laws or Regulations . determined and verified : <br /> 6 . 16 Emergencies a . all field measurements , quantities, <br /> dimensions , specified performance criteria , <br /> A. In emergencies affecting the safety or protec- installation requirements , materials , catalog <br /> tion of persons or the Work or property at the Site or numbers , and similar information with <br /> adjacent thereto, CONTRACTOR is obligated to act to respect thereto; <br /> prevent threatened damage, injury, or loss . <br /> CONTRACTOR shall give ENGINEER prompt written b . all materials with respect to intended <br /> notice if CONTRACTOR believes that any significant use , fabrication , shipping , handling , storage, <br /> changes in the Work or variations from the Contract assembly, and installation pertaining to the <br /> Documents have been caused thereby or are required performance of the Work; <br /> as a result thereof. If ENGINEER determines that a <br /> change in the Contract Documents is required be- c. all information relative to means , <br /> cause of the action taken by CONTRACTOR in methods , techniques , sequences, and <br /> response to such an emergency, a Work Change procedures of construction and safety <br /> Directive or Change Order will be issued . precautions and programs incident thereto; <br /> and <br /> 6 . 17 Shop Drawings and Samples <br /> d . CONTRACTOR shall also have <br /> A. CONTRACTOR shall submit Shop Drawings reviewed and coordinated each Shop <br /> to ENGINEER for review and approval in accordance Drawing or Sample with other Shop <br /> with the acceptable schedule of Shop Drawings and Drawings and Samples and with the <br /> Sample submittals . All submittals will be identified as requirements of the Work and the Contract <br /> ENGINEER may require and in the number of copies Documents , <br /> specified in the General Requirements . The data <br /> shown on the Shop Drawings will be complete with 2 . Each submittal shall bear a stamp or <br /> respect to quantities, dimensions , specified perfor- specific written indication that CONTRACTOR <br /> mance and design criteria , materials , and similar data has satisfied CONTRACTOR's obligations <br /> to show ENGINEER the services , materials , and under the Contract Documents with respect to <br /> equipment CONTRACTOR proposes to provide and CONTRACTOR's review and approval of that <br /> to enable ENGINEER to review the information for the submittal , <br /> limited purposes required by paragraph 6 . 17 . E. <br /> 3 . At the time of each submittal , CON- <br /> B . CONTRACTOR shall also submit Samples to TRACTOR shall give ENGINEER specific <br /> ENGINEER for review and approval in accordance written notice of such variations, if any, that the <br /> with the acceptable schedule of Shop Drawings and Shop Drawing or Sample submitted may have <br /> Sample submittals . Each Sample will be identified from the requirements of the Contract <br /> clearly as to material , Supplier, pertinent data such as Documents , such notice to be in a written com- <br /> catalog numbers, and the use for which intended and munication separate from the submittal ; and , in <br /> otherwise as ENGINEER may require to enable ENGI- addition , shall cause a specific notation to be <br /> NEER to review the submittal for the limited purposes made on each Shop Drawing and Sample sub- <br /> required by paragraph 6 . 17 . E . The numbers of each mitted to ENGINEER for review and approval of <br /> Sample to be submitted will be as specified in the each such variation . <br /> Specifications . <br /> C . Where a Shop Drawing or Sample is required E . ENGINEER's Review <br /> by the Contract Documents or the schedule of Shop 1 . ENGINEER will timely review and <br /> Drawings and Sample submittals acceptable to ENGI- approve Shop Drawings and Samples in <br /> NEER as required by paragraph 2 . 07 , any related accordance with the schedule of Shop <br /> Work performed prior to ENGINEER's review and Drawings and Sample submittals acceptable to <br /> 00700 - 24 00700 - General Conditions REV 04-07.doc <br /> F:\Engineering\Capital Projects\0541 20th Ave Widening, 25th St SW to 21st St SW\Contract Documents\00700 - General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.