Laserfiche WebLink
6 . 15 Hazard Communication Programs approval of the pertinent submittal will be at the sole <br /> expense and responsibility of CONTRACTOR. <br /> A. CONTRACTOR shall be responsible for <br /> coordinating any exchange of material safety data D . Submittal Procedures <br /> sheets or other hazard communication information <br /> required to be made available to or exchanged be- 1 . Before submitting each Shop <br /> tween or among employers at the Site in accordance Drawing or Sample, CONTRACTOR shall have <br /> with Laws or Regulations . determined and verified : <br /> 6 . 16 Emergencies a . all field measurements , quantities, <br /> dimensions , specified performance criteria , <br /> A. In emergencies affecting the safety or protec- installation requirements , materials , catalog <br /> tion of persons or the Work or property at the Site or numbers , and similar information with <br /> adjacent thereto, CONTRACTOR is obligated to act to respect thereto; <br /> prevent threatened damage, injury, or loss . <br /> CONTRACTOR shall give ENGINEER prompt written b . all materials with respect to intended <br /> notice if CONTRACTOR believes that any significant use , fabrication , shipping , handling , storage, <br /> changes in the Work or variations from the Contract assembly, and installation pertaining to the <br /> Documents have been caused thereby or are required performance of the Work; <br /> as a result thereof. If ENGINEER determines that a <br /> change in the Contract Documents is required be- c. all information relative to means , <br /> cause of the action taken by CONTRACTOR in methods , techniques , sequences, and <br /> response to such an emergency, a Work Change procedures of construction and safety <br /> Directive or Change Order will be issued . precautions and programs incident thereto; <br /> and <br /> 6 . 17 Shop Drawings and Samples <br /> d . CONTRACTOR shall also have <br /> A. CONTRACTOR shall submit Shop Drawings reviewed and coordinated each Shop <br /> to ENGINEER for review and approval in accordance Drawing or Sample with other Shop <br /> with the acceptable schedule of Shop Drawings and Drawings and Samples and with the <br /> Sample submittals . All submittals will be identified as requirements of the Work and the Contract <br /> ENGINEER may require and in the number of copies Documents , <br /> specified in the General Requirements . The data <br /> shown on the Shop Drawings will be complete with 2 . Each submittal shall bear a stamp or <br /> respect to quantities, dimensions , specified perfor- specific written indication that CONTRACTOR <br /> mance and design criteria , materials , and similar data has satisfied CONTRACTOR's obligations <br /> to show ENGINEER the services , materials , and under the Contract Documents with respect to <br /> equipment CONTRACTOR proposes to provide and CONTRACTOR's review and approval of that <br /> to enable ENGINEER to review the information for the submittal , <br /> limited purposes required by paragraph 6 . 17 . E. <br /> 3 . At the time of each submittal , CON- <br /> B . CONTRACTOR shall also submit Samples to TRACTOR shall give ENGINEER specific <br /> ENGINEER for review and approval in accordance written notice of such variations, if any, that the <br /> with the acceptable schedule of Shop Drawings and Shop Drawing or Sample submitted may have <br /> Sample submittals . Each Sample will be identified from the requirements of the Contract <br /> clearly as to material , Supplier, pertinent data such as Documents , such notice to be in a written com- <br /> catalog numbers, and the use for which intended and munication separate from the submittal ; and , in <br /> otherwise as ENGINEER may require to enable ENGI- addition , shall cause a specific notation to be <br /> NEER to review the submittal for the limited purposes made on each Shop Drawing and Sample sub- <br /> required by paragraph 6 . 17 . E . The numbers of each mitted to ENGINEER for review and approval of <br /> Sample to be submitted will be as specified in the each such variation . <br /> Specifications . <br /> C . Where a Shop Drawing or Sample is required E . ENGINEER's Review <br /> by the Contract Documents or the schedule of Shop 1 . ENGINEER will timely review and <br /> Drawings and Sample submittals acceptable to ENGI- approve Shop Drawings and Samples in <br /> NEER as required by paragraph 2 . 07 , any related accordance with the schedule of Shop <br /> Work performed prior to ENGINEER's review and Drawings and Sample submittals acceptable to <br /> 00700 - 24 00700 - General Conditions REV 04-07.doc <br /> F:\Engineering\Capital Projects\0541 20th Ave Widening, 25th St SW to 21st St SW\Contract Documents\00700 - General Conditions REV 04-07.doc <br />