Laserfiche WebLink
' When any room in the building is utilized as a storage space, shop, etc . , the parties making <br /> such use of those rooms shall be held responsible for any repairs, patching and cleaning <br /> that may arise from such use . The Owner, at any time during the construction of the <br /> ' project, may direct the Contractor to move materials stored in the building when it <br /> becomes necessary and this will be accomplished at no additional charge to the Owner. <br /> 8 . 01 CLEANING <br /> ' The building must be kept free from all surplus material, dirt, and rubbish at all times, at <br /> the completion of the work all paint spots must be removed from the finished floors , walls, <br /> window and door frames and any glass where required. Finished glass scratched or etched <br /> ' due to cleaning shall be replaced by the Contractor. Limits of acceptance, of any scratched <br /> or etched glass, shall be made by the Owner. <br /> 9 . 01 GLASS BREAKAGE <br /> The Contractor, before acceptance of the building, shall replace all glass that may have <br /> ' become broken, or damaged from any cause . <br /> * * *END OF SECTION * * * <br /> 01200-3 <br />