My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02312 <br /> SWALE CONSTRUCTION <br /> L DESCRIPTION <br /> A. Fine grading of swales shall be accomplished after the existing ground has <br /> been excavated and compacted to within + 0 . 2 ft. of the design elevations . <br /> Fine grading of the swale areas will be done by a motor grader unless <br /> otherwise approved or directed by the Engineer. Hand dressing will not be <br /> required except where shown on the Drawings or in confined areas where <br /> equipment operation is restricted. <br /> B . The Contractor shall maintain and keep open and free from leaves, sticks, <br /> rubble, and other debris, all swales graded by him until final acceptance of the <br /> work. <br /> C . The finished grade shall be completed and shaped to a surface which varies no <br /> more than 0 . 1 foot above or below the Plan elevations except that, <br /> adjacent to pavement, grates , or sidewalk, the swale shall be graded to match the <br /> edge of the pavement, grate or sidewalk. <br /> D . In areas where sodding is required, finished soil grade shall be set 0 . 2 foot <br /> below the plan elevation to compensate for sod thickness . <br /> E . Compaction to a specific density will not be required unless so directed by the <br /> Engineer. However, swales shall be compacted to a firm, even surface true to <br /> grade and cross section. All swales must be rolled. <br /> F . Fine grading of the swale areas shall preferably be done prior to paving the <br /> asphalt wearing course . If the Contractor chooses to fine grade the swale <br /> areas subsequent to paving, he must exercise extreme care when dressing <br /> areas adjacent to pavement areas to avoid damage to the pavement. No <br /> handling of swale material shall be permitted on the pavement surface . <br /> G . After final dressing of the swales, the Contractor shall seed or sod them as <br /> required by the Plans in accordance with Section 02204 or 02205 of the <br /> Specifications_ <br /> C : \ Down1oad \ techspec - 02312 . doc <br /> 02312 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.