My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . Prior to installation, the interior of all pipe and fittings shall be <br /> inspected for debris , sediment accumulation, sand, and the like, and shall <br /> be cleaned as required to remove such foreign matter. Joint surfaces <br /> such as gaskets , gasket grooves, spigots, and bells shall be cleaned of <br /> sand and grit prior to joining. <br /> 4 . Gasket lubricants shall be stored and applied in a manner that will <br /> prevent significant contamination or pick-up of sand and grit. <br /> 5 . The pipe spigot shall be centered in and aligned with its mating bell prior <br /> to insertion and forced evenly in a straight line to seating depth, taking care <br /> not to over-bell the joint. Where required, deflections shall be made after the <br /> joint is seated . <br /> 6 . Joining shall generally be done by hand or by push-bar with a cushion <br /> block whenever pipe size and weight permit. When a mechanical <br /> pushing/pulling device such as chain-puller, come-along, and the like is <br /> required, the device shall be used in a manner that will not deform <br /> gouge, chip, or otherwise damage the pipe or cause significant <br /> disturbance of the prepared bedding . In no case shall joints be made by <br /> it or swinging the spigot into the bell to seat the joint. <br /> 7 . Fittings and appurtenances shall be fully, independently supported on the <br /> bedding or on a permanent foundation so as not to bear on the pipe upon <br /> completion of the installation. <br /> 8 . The installed piping system shall be kept free of dirt, trench water, and other <br /> foreign matter during the progress of the work, and all open ends of the line <br /> shall be sealed with watertight plugs whenever work is not in progress . <br /> 9 . Empty installed pipe shall be secured against flotation due to potential trench <br /> flooding by timely placement of sufficient backfill or approved anchoring <br /> devices sufficient to resist pipe buoyancy. <br /> 10 . INSTALLATION OF FITTINGS <br /> A. Fittings , plugs , and caps shall be set and jointed to pipe in the manner <br /> heretofore specified for cleaning, laying and jointing pipe . <br /> 11 . INSTALLATION OF DRAINAGE STRUCTURES <br /> A. Excavation for drainage structures shall be of sufficient size to permit <br /> construction of the structure to progress without hindrance from the - walls of the <br /> excavation or from sloughed materials . No less than 12 inches clearance shall be <br /> provided between excavation walls and walls of the structure . If soil conditions <br /> encountered at the bottom of the excavation would in the sole opinion of the <br /> Engineer be unsuitable for foundation, the Contractor shall remove and dispose <br /> of the unsuitable material to the depth where suitable bearing can be obtained . <br /> C : \ Down1oad \ techspec - 02403 . doc 02403 - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.