My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' e determination of then necessity e essity for and the extent of additional excavation <br /> shall be made by the Engineer, who shall inform the Contractor in writing <br /> ' regarding such necessity and the extent. This excavation shall then be backfilled to <br /> the appropriate grade with Type 1 or Type 3 backfill material , placed in 8 inch <br /> layers and compacted to a density equal to 100 percent of the maximum density as <br /> ' determined by AASHTO T480 . <br /> B . Installation of drainage structures shall conform to the details as shown on the <br /> ' Drawings and, unless otherwise specified, shall conform with Section 425 of the <br /> 1986 Edition of the Florida D . O . T. Standard Specifications for Road and Bridge <br /> Construction. Backfill shall be placed in lifts not to exceed 12 inches loose depth <br /> and compacted to 95 percent of maximum density per AASHTO T480 in unpaved <br /> areas and to required subgrade density in areas of paving or curbing . <br /> C . Backfill shall not be placed against cast-in-place concrete structures until the <br /> concrete has attained sufficient strength to resist the load without damage, and in <br /> no case , less than seven days after the concrete was placed. <br /> 12 . AS-BUILT DRAWINGS <br /> A . During the installation of Drainage Pipe and Structures the Contractor shall keep <br /> accurate records of the As-Built construction showing the location of all changes in <br /> alignment, services , utility crossings , and similar data. Items shall be located from <br /> tpermanent objects such as centerline of street, manholes, valves, etc . Upon <br /> completion of the project the Contractor shall deliver to the Engineer an As-Built <br /> Drawing showing the above information. <br /> 1 <br /> C : \ Down1oad \ techspec - 02403 . doc 02403 - 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.