My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
exceeding 3 -inches (2-inches in the final 6-inch layer) in diameter, <br /> and mechanically compacted in 6-inch layers to an average maximum <br /> density of 100% as determined by AASHTOT-99 . <br /> ' c . All Other Areas Under Pavements - The initial lift shall consist of <br /> clean, fine , select materials , not exceeding 3 /4 " in diameter under the <br /> ' haunches of the pipe . The material shall be placed in layers not to exceed 4 " . <br /> The initial lift shall be manually compacted to 95 % of the maximum density as <br /> determined by AASHTO T- 180 . Subsequent lifts to 12 " above the pipe shall <br /> ' be constructed as specified for the initial lift, except that had operated <br /> mechanical tampers may be used. Additional lifts from 12 " above the pipe <br /> to the top of subgrade shall be carefully backfilled with material free from <br /> ' organic material and stones or clumps exceeding 34nches (2 -inches in the <br /> final 6-final layer) in diameter, and compacted in 64nch layers to an <br /> average maximum density of 95 % as determined by AASHTO T- 180 . <br /> d. Areas Outside of Pavements - Backfill of all areas outside of <br /> pavements shall be constructed as specified above for " all other areas under <br /> ' pavements " except that the additional lifts shall be constructed as specified to <br /> the finished grade . <br /> ' e . Density Testing - The Contractor shall arrange to have <br /> sufficient soil tests made by an independent testing laboratory <br /> approved by the Engineer to demonstrate conformance of his work with <br /> ' the stability and compaction levels required by these specifications . <br /> Compaction tests shall be taken at intervals listed herein or as deemed <br /> ' necessary by the Engineer. All test results shall be signed and sealed by a <br /> Florida Registered Engineer, and a copy provided to the Owner and Engineer. <br /> In no case shall the Contractor proceed with construction over <br /> compacted material until the tests prove satisfactory and approval is given by <br /> the Engineer. <br /> In general, at least one test for maximum dry density/optimum <br /> moisture content shall be performed on a representative sample of each <br /> ' inherently different material to be used for compacted backfill or embankment <br /> fill . <br /> ' As a minimum, in-place density tests shall be performed at the rate of one test <br /> location per 300 lineal feet (or fraction thereof) of trench on the compacted <br /> backfill, under each drive lane at all roadway crossings and at all significant <br /> ' changes in bedding and backfill material . Tests shall be taken in one foot lifts <br /> beginning at one foot above the pipe and ending at the final grade . Test <br /> locations shall be as directed by the Engineer or his authorized <br /> ' representative . If any test results are unsatisfactory , the Contractor shall re- <br /> excavate and recompact the backfill , at his expense, to the extent directed by the <br /> Engineer until the required compaction is obtained . The cost of all proctor and <br /> density tests shall be the responsibility of the Contractor and shall be included <br /> in the cost of installed and completed water main. <br /> CADownloadVechspec-02501 .doc SC501 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.