Laserfiche WebLink
exceeding 3 -inches (2-inches in the final 6-inch layer) in diameter, <br /> and mechanically compacted in 6-inch layers to an average maximum <br /> density of 100% as determined by AASHTOT-99 . <br /> ' c . All Other Areas Under Pavements - The initial lift shall consist of <br /> clean, fine , select materials , not exceeding 3 /4 " in diameter under the <br /> ' haunches of the pipe . The material shall be placed in layers not to exceed 4 " . <br /> The initial lift shall be manually compacted to 95 % of the maximum density as <br /> determined by AASHTO T- 180 . Subsequent lifts to 12 " above the pipe shall <br /> ' be constructed as specified for the initial lift, except that had operated <br /> mechanical tampers may be used. Additional lifts from 12 " above the pipe <br /> to the top of subgrade shall be carefully backfilled with material free from <br /> ' organic material and stones or clumps exceeding 34nches (2 -inches in the <br /> final 6-final layer) in diameter, and compacted in 64nch layers to an <br /> average maximum density of 95 % as determined by AASHTO T- 180 . <br /> d. Areas Outside of Pavements - Backfill of all areas outside of <br /> pavements shall be constructed as specified above for " all other areas under <br /> ' pavements " except that the additional lifts shall be constructed as specified to <br /> the finished grade . <br /> ' e . Density Testing - The Contractor shall arrange to have <br /> sufficient soil tests made by an independent testing laboratory <br /> approved by the Engineer to demonstrate conformance of his work with <br /> ' the stability and compaction levels required by these specifications . <br /> Compaction tests shall be taken at intervals listed herein or as deemed <br /> ' necessary by the Engineer. All test results shall be signed and sealed by a <br /> Florida Registered Engineer, and a copy provided to the Owner and Engineer. <br /> In no case shall the Contractor proceed with construction over <br /> compacted material until the tests prove satisfactory and approval is given by <br /> the Engineer. <br /> In general, at least one test for maximum dry density/optimum <br /> moisture content shall be performed on a representative sample of each <br /> ' inherently different material to be used for compacted backfill or embankment <br /> fill . <br /> ' As a minimum, in-place density tests shall be performed at the rate of one test <br /> location per 300 lineal feet (or fraction thereof) of trench on the compacted <br /> backfill, under each drive lane at all roadway crossings and at all significant <br /> ' changes in bedding and backfill material . Tests shall be taken in one foot lifts <br /> beginning at one foot above the pipe and ending at the final grade . Test <br /> locations shall be as directed by the Engineer or his authorized <br /> ' representative . If any test results are unsatisfactory , the Contractor shall re- <br /> excavate and recompact the backfill , at his expense, to the extent directed by the <br /> Engineer until the required compaction is obtained . The cost of all proctor and <br /> density tests shall be the responsibility of the Contractor and shall be included <br /> in the cost of installed and completed water main. <br /> CADownloadVechspec-02501 .doc SC501 - 10 <br />