My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 ) Installation of Detectable Buried Warning Tape <br /> Tape shall be tied to each valve or fitting and shall run continuously with no <br /> splices between valves or fittings . Tape shall be placed at a maximum <br /> depth of 12 inches below finished grade directly above the pipe <br /> centerline . Following placement of tape, the trench shall be backfilled with <br /> due caution to prevent displacement or damage to the tape . <br /> 4) Installation of Detectable Buried Trace Wire <br /> Trace wire shall be installed on all pipe, valve and fittings, with splices , <br /> branches , connections and terminations as shown on the plans . <br /> 5 ) Separation Requirements <br /> Water mains shall be laid at least ten ( 10) feet horizontally from any existing <br /> or proposed sanitary or storm sewer, or any other sanitary hazard . Water <br /> mains crossing sanitary hazards shall be laid to provide a minimum vertical <br /> clearance of 18 inches between the outside of the water main and the outside <br /> of the sanitary hazard. Where the water main passes under the sanitary hazard <br /> or the 18 inch clearance cannot be met, the water main shall have . a full pipe <br /> length centered on the sanitary hazard. The water main pipe section shall <br /> be ductile iron pipe or it shall be encased in a minimum of 6 inches of <br /> concrete all around . <br /> D . Field Quality Control <br /> 1 ) Hydrostatic Tests - The Contractor shall provide all necessary material and <br /> shall perform all work required in connection with the test, including <br /> temporary plugs where required. All pipe shall be tested to a hydrostatic <br /> pressure of 150 p . s . i . The required pressure as measured at the point of <br /> highest elevation shall be applied for not less than two hours , and all pipe , <br /> fittings, valves and joints shall be made water-tight if leakage is evident. <br /> No ductile iron pipe installation will be accepted unless and until the leakage <br /> is less than that as specified under Section 4 . 2 of the AWWA (ANSI) C600 , <br /> P . V . C . pipe installations shall meet the leakage requirements of AWWA <br /> M23 as applicable . <br /> E . Adjusting and Cleaning <br /> 1 . Restoring Surfaces - The top surfaces of the backfill shall be restored to the <br /> original or planned conditions . Trenches shall be carefully examined upon <br /> the completion of backfilling and surface irregularities , that are dangerous or <br /> obstructive to traffic, are to be removed . <br /> Paved sections shall conform in grade with adjacent areas and shall be of at <br /> least equal quality. Design mixes for flexible pavement shall be subject to <br /> approval by the Engineer. All damaged or undermined areas of existing <br /> pavement, not previously removed, shall be removed and restored to original <br /> conditions or in the specified manner. <br /> CADown1oad\techspec-02501 . doc SC501 - 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.