My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01400 - QUALITY CONTROL <br /> PART 1 - GENERAL <br /> 1 . 01 GENERAL : <br /> The work of this section includes Quality Assurance; and the independent <br /> laboratory and field sampling, testing, inspections, supervision and reports of those <br /> materials required by the various sections of these specifications . Tests and inspections <br /> shall be performed by a recognized Testing Laboratory selected by the Contractor and <br /> approved by the Architect. <br /> 1 . 02 COOPERATION : <br /> A. Testing Laboratory shall cooperate with all trades whose work affects or is affected <br /> by the tests and inspections . <br /> Be Contractor shall cooperate with and provide assistance necessary in taking samples, <br /> making field tests and making inspections, and he shall schedule and coordinate his <br /> work to hold costs of tests and inspections to a reasonable minimum. <br /> 1 . 03 PAYMENTS : <br /> A . Costs for tests and inspections shall be incurred by the Contractor. <br /> Be If the results of any test or inspection indicates failure to meet the specified <br /> requirements, the Contractor shall be responsible for the costs of retesting or <br /> reinspection. <br /> C . Manner of Work : When in the opinion of the Architect, tests or inspections are <br /> required because of the manner in which the Contractor does his work, such as <br /> questionable quality of materials and/or workmanship, questionable sources of <br /> material, substitution of materials or sources of same for those previously accepted, <br /> or failure or material to comply with specification or plan requirements ; the costs <br /> for such tests or inspections shall be incurred by the Contractor. <br /> D . Should the Contractor refuse to perform such tests , the direct cost of testing, <br /> I <br /> ncurred by the Owner, shall be deducted from the Contract sum for construction . <br /> 1 . 04 DEFECTIVE MATERIALS : <br /> The Architect reserves the right to demand for test or special examination any material or <br /> part thereof to insure compliance with the specification and he may reject any material or <br /> part judged defective as a result of such tests and the Contractor shall replace such <br /> defective material or part with material or part that does comply with the specifications at <br /> no additional expense to the Owner. <br /> 01400 = 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.