My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
copy of each shop drawings , placed thereon by the Contractor. Shop drawings <br /> received without the Contractor' s " CHECKED" stamp will be cause for <br /> ' immediate return without further action by the Architect until properly <br /> resubmitted. Each drawing correctly submitted will be checked by the <br /> ' Architect and marked by him in one of the following ways : <br /> a. REVIEWED : NO EXCEPTIONS TAKEN <br /> ' b . REVIEWED : NOTE COMMENTS AND MAKE <br /> CORRECTIONS AS NOTED <br /> c. REVIEWED • REVISE AND RESUBMIT <br /> ' d. REVIEWED • REJECTED <br /> F . Copies of Product Data : mark each copy to indicate actual product to be provided ; <br /> ' show selections from among options in manufacturer' s printed product data. Submit <br /> six copies ; two copies of which will be returned where required for maintenance <br /> manuals ; and an additional copy to be maintained at project site for reference purposes . <br /> ' Do not proceed with installation of manufactured products until a copy of related product <br /> data is in installer' s possession. <br /> ' 2 . 02 SUBSTITUTIONS <br /> ' A . Approval Required : <br /> 1 . The Contract is based on the standards of quality established in the Contract <br /> ' Documents. <br /> 2 . All products proposed for use, including those specified by required attributes <br /> and performance, shall require approval by the Architect before being <br /> ' incorporated into the work. <br /> 3 . Do not substitute materials, equipment or methods unless such substitution has <br /> been specifically approved for this work by the Architect, in writing . <br /> Be "Or Equal" : <br /> 1 . Where the phrase "or equal" or "or equal as approved by the Architect" occurs <br /> in the Contract Documents , do not assume that materials, equipment or <br /> methods will be approved as equal unless the item has been specifically <br /> ' approved in writing by the Architect. <br /> 2 . The decision of the Architect shall be final . <br /> ' * * * END OF SECTION * * * <br /> 1 <br /> 01300 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.