My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
copy of each shop drawings , placed thereon by the Contractor. Shop drawings <br /> received without the Contractor' s " CHECKED" stamp will be cause for <br /> ' immediate return without further action by the Architect until properly <br /> resubmitted. Each drawing correctly submitted will be checked by the <br /> ' Architect and marked by him in one of the following ways : <br /> a. REVIEWED : NO EXCEPTIONS TAKEN <br /> ' b . REVIEWED : NOTE COMMENTS AND MAKE <br /> CORRECTIONS AS NOTED <br /> c. REVIEWED • REVISE AND RESUBMIT <br /> ' d. REVIEWED • REJECTED <br /> F . Copies of Product Data : mark each copy to indicate actual product to be provided ; <br /> ' show selections from among options in manufacturer' s printed product data. Submit <br /> six copies ; two copies of which will be returned where required for maintenance <br /> manuals ; and an additional copy to be maintained at project site for reference purposes . <br /> ' Do not proceed with installation of manufactured products until a copy of related product <br /> data is in installer' s possession. <br /> ' 2 . 02 SUBSTITUTIONS <br /> ' A . Approval Required : <br /> 1 . The Contract is based on the standards of quality established in the Contract <br /> ' Documents. <br /> 2 . All products proposed for use, including those specified by required attributes <br /> and performance, shall require approval by the Architect before being <br /> ' incorporated into the work. <br /> 3 . Do not substitute materials, equipment or methods unless such substitution has <br /> been specifically approved for this work by the Architect, in writing . <br /> Be "Or Equal" : <br /> 1 . Where the phrase "or equal" or "or equal as approved by the Architect" occurs <br /> in the Contract Documents , do not assume that materials, equipment or <br /> methods will be approved as equal unless the item has been specifically <br /> ' approved in writing by the Architect. <br /> 2 . The decision of the Architect shall be final . <br /> ' * * * END OF SECTION * * * <br /> 1 <br /> 01300 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.