My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- dosages in accordance with Table 11 - 1 through a tap at one end, while water is <br /> being withdrawn at the other end of the line . The chlorine solution shall <br /> remain in the pipeline for no less than 24 hours . <br /> Co Following the chlorination period, all treated water shall be flushed from the <br /> lines at their extremities and replaced with water from the existing water <br /> system . Bacteriological sampling and analysis of the replacement water shall <br /> then be made in the presence of the Engineer in full accordance with the <br /> AWWAManual C-651 . Passing bacteriological test results shall be remitted to <br /> the Engineer within one week of testing . All sample points shall be <br /> sampled on the same day. The Contractor will be required to re-chlorinate and <br /> retest any non-passing segment. The line shall not be placed in service until <br /> the requirements of the State and County Public Health Department are met. <br /> D . Special disinfecting procedures shall be used in connections to existing mains, <br /> and where the method outlined above is not practical . <br /> E . The Contractor shall make all arrangements necessary with an independent <br /> commercial laboratory approved by the Department of Health and <br /> Rehabilitative Service (HRS) for the collection and examination of samples of <br /> water from disinfected water mains . These samples shall be examined for <br /> compliance with HRS requirements . Sampling shall be made daily and <br /> continuously until two successive examinations are found satisfactory. Should <br /> any examination be found unsatisfactory, the line shall be flushed and <br /> disinfected again. Certified copies of all laboratory analyses shall be provided to <br /> the Engineer within one week after testing. The cost of all sampling, <br /> flushing, and disinfecting shall be included in the contract price and no <br /> additional charge shall be made to the Owner for this work. County <br /> personnel shall operate all valves and be present to determine volume of <br /> water used for flushing . <br /> TABLE 11 - 1 <br /> Chlorine Required to Produce 25-mg/L Concentration <br /> in 100 ft. of Pipe by Diameter <br /> Pipe 100-Percent 1 -Percent <br /> Diameter Chlorine Chlorine Solution <br /> in . The gal . <br /> --- ----- --- ----------------------------------------------------------------------------=--------------------------- <br /> 4 0 . 013 0 . 16 <br /> 6 0 . 030 0 . 36 <br /> 8 0 . 054 0 . 65 <br /> C :\Down1oad\techspec-02504.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.