My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 10 0 . 085 1 . 02 <br /> - 12 0 . 120 1 .44 <br /> r16 0 . 217 2 . 60 <br /> r <br /> 3 . PRESSURE AND LEAKAGE TESTS OF UNDERGROUND <br /> PRESSURE PIPING <br /> r <br /> A. Hydrostatic pressure and leakage tests for ductile iron pipe shall conform with <br /> r Section 4 of AWWA C-600 Specification with the exception that the <br /> Contractor shall furnish all gauges, meters, pressure pumps and other <br /> equipment needed to test the line . Engineer shall be present during all <br /> r testing, and final inspections . P .V . C . pipe shall be tested in accordance with <br /> the applicable sections of AWWA M23 . No hydrostatic testing against <br /> existing system valves shall be allowed until the section to be tested has been <br /> r bacteriologically cleared. The temporary fill connections shall be removed or <br /> otherwise isolated from the existing system prior to pressure testing . <br /> r B . The pressure required for the field hydrostatic pressure test shall be 50 <br /> percent above the normal working pressure but not less than 150 psi . The <br /> Contractor shall provide temporary plugs and blocking necessary to maintain the <br /> r required test pressure . Corporation cocks at least 3 /44nches in diameter, pipe <br /> riser and angle globe valves shall be provided at each pipe dead-end in order to <br /> bleed air from the line . Duration of pressure test shall be at least 2 hours . The <br /> ' cost of these items shall be included as a part of testing . <br /> co The leakage test shall be conducted concurrently with the hydrostatic <br /> r pressure test and shall be of not less than 2 hours duration. All leaks evident at <br /> the surface shall be repaired and leakage eliminated regardless of total <br /> leakage as shown by test. Lines which fail to meet tests shall be repaired and <br /> r retested as necessary until test requirements are complied with. Defective <br /> materials, pipes, valves and accessories shall be removed and replaced . The <br /> pipe section to be tested shall be between valves or in such sections as may be <br /> r directed by the Engineer by shutting valves or installing temporary plugs as <br /> required . In no case shall the section of line to be hydrostatically tested <br /> exceed 2000 feet in length. The line shall be filled with water and all air <br /> ' removed and the test pressure shall be maintained in the pipe for the entire test <br /> period by means of a force pump to be furnished by the Contractor. <br /> Accurate means shall be provided for measuring the water required to <br /> ' maintain this pressure. The amount of water required is a measure of the <br /> leakage . <br /> rD . The Contractor must submit his plan for testing to the Engineer for review at <br /> least five (5 ) working days before starting the test. The Contractor shall <br /> remove and adequately dispose of all blocking material and equipment after <br /> rcompletion and acceptance of the field hydrostatic test, unless otherwise <br /> directed by the Engineer. Any damage to the pipe coating shall be repaired by the <br /> rContractor. <br /> E . The Engineer or the Engineer's representative must be present during testing . <br /> rC :\Down1oad\techspec-02504. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.