My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. The pumping/pressurizing and make-up water measuring equipment shall be <br /> provided by the Contractor and approved by the Engineer prior to testing . The <br /> pressurizing equipment shall be designed and operated in a manner that will <br /> minimize pressure surging and pulsing within the pipe. <br /> ' F . The Contractor shall provide and install a temporary valved tap with a 1 /4 " FPT <br /> connection to receive the pressure gauge in each pipe run to be tested. Upon <br /> satisfactory completion of testing, the Contractor shall remove and plug the pipe . <br /> ' G. Inre aration for testing,p p sting, the pipe shall be slowly filled with clean water from an <br /> approved source, taking care to purge all air pockets. Water remaining in the pipe <br /> system after flushing may be used and supplemented as necessary with prior <br /> approval by the Engineer, and clean test water may be reused for sequential testing of <br /> pipe segments . <br /> H . In conducting the test, water shall be pumped into the full pipe until test pressure is <br /> attained, and make-up water shall be added as soon as the pressure drops to 5 psi <br /> below test pressure . All make-up water shall be accurately measured, and the total <br /> test leakage shall be defined as the volume of make-up water added. <br /> ' I . Should the tested section fail to meet these requirements, the Contractor shall , at his <br /> own expense, locate and repair the defects and retest the section until it is acceptable . <br /> ' J. Immediately upon completion of a passing pressure test all valves shall be operated <br /> ' to insure their full opening and closing . <br /> ' C :\Down1oad\techspec-02704 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.