My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01500 - <br /> TEMPORARY FACILITIES & CONTROL <br /> PAR 1 - GENERAL <br /> ' 1 . 01 GENERAL <br /> Refer to General Conditions for commitments which result in requirements for Contractor <br /> ' to provide temporary facilities as may be required for performance of the work and <br /> fulfillment of the Contract. This section specifies certain minimum temporary facilities <br /> to be provided regardless of methods and means selected for performance of the work, <br /> ' but not by way of limitation and not assured for compliance with governing regulation. <br /> Use of alternate temporary facilities is Contractor ' s option, subject to Owner' s <br /> acceptance . Temporary facilities is defined to exclude tools and construction machines, <br /> ' testing, demolition, alterations, soil borings, mock-ups and similar items . The contractor <br /> shall be responsible for the cost of all consumed utilities until such time as the Owner is <br /> issued the Certificate of occupancy. <br /> ' PART 2 - PRODUCTS <br /> ' 2 . 01 DEWATERING <br /> ' Maintain site and construction work free of water accumulation. Do not endanger the <br /> work or adjacent properties . Maintain protection against flooding . Protect existing <br /> drainage systems . <br /> 2 . 02 POWER DISTRIBUTION <br /> Provide weatherproof, grounded circuits with groundfault interruption feature, with <br /> ' proper power characteristics and either permanently wired or plug-in connections as <br /> appropriate for intended use . Provide overload-protected disconnect switch for each <br /> ' circuit at distribution panel . Space 4 'gang convenience outlets (20 Amp circuit) so that <br /> every portion of work can be reached with a 100-foot extension cord. <br /> 2 . 03 TEMPORARY LIGHTING <br /> Provide lighting of intensity and qualify sufficient for proper and safe performance of the <br /> ' work, and for access thereto . <br /> 2 . 04 TEMPORARY DRIVES <br /> ' Where feasible, use subbase and base construction of permanent drives and paving as <br /> ' temporary paved construction areas ; and delay installation of finish paving courses until <br /> possibility of damage from construction operations has been minimized . Otherwise , <br /> ' 01500 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.