Laserfiche WebLink
provide not less than compacted subgrade of satisfactory soil material . Remove <br /> temporary paving when no longer needed. <br /> 2 . 05 TEMPORARY UTILITIES <br /> Provide necessary connections, piping , valves, meters, and hoses from the distribution <br /> points to points on the site where water and electrical power are necessary to carry on the <br /> work. Upon completion of the work, remove all temporary utilities . <br /> 2 . 06 HOISTING, GENERAL <br /> Provide cranes , hoists, and similar temporary construction facilities as needed to <br /> adequately perform the work. Comply with manufacturer' s instructions and governing <br /> regulations for installation, operation and removal . <br /> 2 . 07 MISCELLANEOUS FACILITIES <br /> Provide miscellaneous facilities as needed, including temporary stairs, ramps , ladders, <br /> runways staging, shoring, scaffolding, railings, dust controls , bracings , barriers closures , <br /> platforms , temporary partitions , waste chutes, storage shed, and similar items . <br /> 2 . 08 TEMPORARY TOILETS <br /> Where permitted by governing regulations, provide single-occupant, self-contained units <br /> of either chemical aerated recirculation type of combustion type ; glass fiber reinforced <br /> polyester enclosure ; equipped with both urinal and stool fixtures . Supply units with <br /> tissue and, where not located nearby, separate wash facilities, supply with wet-type hand <br /> towels and waste containers . Locate units so that personnel will travel no more than 200 ', <br /> including distance horizontally, to reach a unit. <br /> 2 . 09 LOCKUP AND SECURITY <br /> As construction of building structure or shell progress and it becomes feasible to secure <br /> project against intrusion, provide temporary security enclosure, doors and locks as <br /> necessary to prevent unauthorized entrance . Deliver, store and lockup materials and <br /> equipment in a manner which will prevent theft and vandalism. <br /> 2 . 10 ENVIRONMENTAL PROTECTION <br /> Review exposure to possible environmental problems, with Architect . Establish <br /> procedures and discipline among tradesmen and provide needed facilities which will <br /> protect against environmental problems (pollution of air, water and soil , excessive noise, <br /> and similar problems) . <br /> 01500-2 <br />