Laserfiche WebLink
' 2 . 11 TEMPORARY WATER <br /> ' The Contractor and his Subcontractors must provide water service as connected to the <br /> available municipal water system, located on the site, for all related requirements for <br /> ' construction of the work as well as any specified landscaping requirements . The <br /> Contractor shall pay for all water utilized for construction and to sustain any specified <br /> landscaping until transferred to the Owner. <br /> ' 2 . 12 JOB SITE PHONE AND FIELD OFFICE <br /> ' The Contractor will be required to engage the local telephone company to install and <br /> maintain a jobsite telephone . The Contractor shall provide the phone number to the <br /> Owner and the Architect. Unless stipulated otherwise, a job site Field Office is required <br /> ' for all projects . <br /> PART 3 - EXECUTION <br /> 3 . 01 GENERAL <br /> ' A. Comply with applicable requirements specified in Division 15 - Mechanical, and <br /> Division 16 - Electrical <br /> ' B . Maintain and operate systems to assure continuous service . <br /> Co Modify and extend systems as work progress requires . <br /> ' 3 . 02 REMOVAL <br /> ' A. Completely remove temporary materials and equipment when their use is no <br /> longer required and leave the site in a clean condition. <br /> ' B . Clean and repair damage caused by temporary installations or use of temporary <br /> facilities . <br /> * * *END OF SECTION * * * <br /> 01500 -3 <br />