My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 2 . 11 TEMPORARY WATER <br /> ' The Contractor and his Subcontractors must provide water service as connected to the <br /> available municipal water system, located on the site, for all related requirements for <br /> ' construction of the work as well as any specified landscaping requirements . The <br /> Contractor shall pay for all water utilized for construction and to sustain any specified <br /> landscaping until transferred to the Owner. <br /> ' 2 . 12 JOB SITE PHONE AND FIELD OFFICE <br /> ' The Contractor will be required to engage the local telephone company to install and <br /> maintain a jobsite telephone . The Contractor shall provide the phone number to the <br /> Owner and the Architect. Unless stipulated otherwise, a job site Field Office is required <br /> ' for all projects . <br /> PART 3 - EXECUTION <br /> 3 . 01 GENERAL <br /> ' A. Comply with applicable requirements specified in Division 15 - Mechanical, and <br /> Division 16 - Electrical <br /> ' B . Maintain and operate systems to assure continuous service . <br /> Co Modify and extend systems as work progress requires . <br /> ' 3 . 02 REMOVAL <br /> ' A. Completely remove temporary materials and equipment when their use is no <br /> longer required and leave the site in a clean condition. <br /> ' B . Clean and repair damage caused by temporary installations or use of temporary <br /> facilities . <br /> * * *END OF SECTION * * * <br /> 01500 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.