My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 03200 - CONCRETE REINFORCEMENT <br /> PART 1 - GENERAL <br /> 1 . 02 QUALITY ASSURANCE <br /> A . Qualifications of Workmen <br /> L Provide at least one person who shall be present at all times during <br /> execution of this portion of the Work and who shall be thoroughly familiar <br /> with the type of materials being installed and the best methods for their <br /> installation and who shall direct all Work performed under this Section. <br /> B . Codes and Standards <br /> 1 . Comply with applicable provisions of the latest edition of the Building Code <br /> that has jurisdiction. <br /> 2 . Where provisions of pertinent codes and standards conflict with this <br /> Specification, the more stringent provisions shall govern. <br /> 1 . 03 SUBMITTALS <br /> A . Shop Drawings <br /> 1 . Within thirty-five (35) days after award of Contract, and before any concrete <br /> reinforcement materials are fabricated and/or delivered to the job site, <br /> submit Shop Drawings to the Architect. <br /> 2 . Do not fabricate and/or deliver concrete reinforcement to the job site until <br /> receipt of Shop Drawings approval from the Architect. <br /> 1 . 04 PRODUCT HANDLING <br /> A . Protection <br /> 1 . Use all means necessary to protect concrete reinforcement before, during, <br /> and after installation and to protect the installed work and materials of all <br /> other trades . <br /> 2 . Store in a manner to prevent excessive rusting and fouling with dirt, grease, <br /> and other bond-breaking coatings . <br /> B . Placements <br /> 1 . In the event of damage, immediately make all repairs and replacements <br /> necessary to the approval of the Architect and at no additional cost to the <br /> Owner. 032004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.