My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART2 - PRODUCTS <br /> ' 2 . 01 CONCRETE REINFORCEMENT <br /> A. All concrete reinforcement materials shall be new, free from rust, and complying <br /> with the following reference standards unless otherwise specified on the drawings . <br /> 1 . Bars for reinforcement : " Specifications for Deformed Billet- Steel Bars for <br /> ' Concrete Reinforcement", ASTM A-615 , latest editions , Grade 60 , except <br /> that bars No . 4 and smaller may be Grade 40 . <br /> ' 2 . Wire for reinforcement : " Specifications for Cold-Drawn Steel Wire for <br /> Concrete Reinforcement", ASTM A- 82 , <br /> 3 . Wire fabric : "Specifications for Wire Fabric for Concrete Reinforcement", <br /> ASTM A485 , latest edition. <br /> i2 . 02 OTHER MATERIALS <br /> A. All other materials , not specifically described but required for a complete and <br /> proper installation of concrete reinforcement, shall be as selected by the Contractor <br /> subject to the approval of the Architect . <br /> PART 3 - EXECUTION <br /> 3 . 01 SURFACE CONDITIONS <br /> A. Inspection <br /> 1 . Prior to installation of the Work of this Section carefully inspect ect the <br /> installed work of all other trades and verify that all such work is complete to <br /> the point where this installation may properly commence . <br /> 2 . Verify that concrete reinforcement may be installed in strict accordance with <br /> ' all pertinent codes and regulations , the approved Shop Drawings , and the <br /> original design. <br /> ' B . Discrepancies <br /> 1 . In the event of discrepancy, immediately notify the Architect. <br /> 2 . So not proceed with installation in areas of discrepancy until all such <br /> ' discrepancies have been fully resolved . <br /> 03200 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.