My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Be Expansion Joints : <br /> ' i . Locate as shown on drawings . <br /> 2 . Joints in walkways maximum at 20' o . c . , snap lines and saw-cut 1 /8 " wide <br /> by l " deep between expansion joints in equal bays at not over 5 ' o . c . , within <br /> 24 hours of concrete placement or until concrete is trafficable with power <br /> saw. <br /> ' 3 . Joints shall be straight and smooth. They shall have hardened before fresh <br /> concrete is deposited against them. <br /> ' 4 . One half inch joint where slabs are up against the exterior of masonry walls , <br /> unless otherwise detailed . Do not place any expansion material on the <br /> inside face of masonry walls where slabs are poured against same walls . <br /> 3 . 04 CURING <br /> A . Begin curing of concrete as soon as practicable afterlacin but not more than 3 <br /> P g <br /> hours thereafter. Provide a total wet cure time of 7 days minimum at 50 degrees F <br /> minimum temperature . <br /> Be Curing of structural members shall begin immediately after removal of forms . <br /> r <br /> C . Apply curing compounds as specified above, clear for exposed slabs . Compound <br /> ' used on floors that are to receive tile or other additional finish shall be compatible <br /> with adhesives and finish materials . Apply first coat of curing compound as soon <br /> as possible after pouring. <br /> ' 3 . 05 FINISHES <br /> A . Formed Surfaces <br /> 1 . Finishes - Defined : <br /> a. Rough Form Finish . <br /> Reasonable true to line and place . Tie holes and defects shall be <br /> ' patched and fins exceeding 1 /4 " in height shall be chipped off or <br /> rubbed off. Otherwise, surfaces may be left with the texture <br /> imparted by the forms . <br /> b . Smooth Form Finish : <br /> The form facing material shall produce a smooth, hard, uniform <br /> ' texture on the concrete . It may be plywood, tempered concrete- <br /> form-grade hardboard, metal , or other material capable of producing <br /> ' the desired finish. The arrangement of the facing material shall be <br /> 03300-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.