My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
orderly and symmetrical , with the number of seams kept to the <br /> practical minimum. It shall be supported by studs or other backing <br /> capable of preventing excessive deflection. Material with raised <br /> grain, torn surfaces , worn edges, patches , dents, or other defects <br /> which will impair the texture of the concrete surface shall not be <br /> used. Tie holes and defects shall be patched . All fins shall be <br /> completely removed. It is the intention of this surface to produce an <br /> Architectural Surface suitable for public view as a completed surface <br /> to receive paint. Strict quality control of this surface shall be <br /> required . See ACI 301 . <br /> C , Smooth Rubbed Finish : <br /> To be applied to all smooth form finishes . (All work will conform <br /> with ACI Standard 301 -latest edition) to produce a smooth <br /> Architectural effect. <br /> 2 . Finishes - Unspecified Buildings <br /> If the finish is unspecified, the following finishes shall be used as <br /> applicable. <br /> a. Rough Form Finish . <br /> For all concrete surfaces not exposed to public view, including <br /> concrete to receive stucco, <br /> b . Smooth Form Finish : <br /> For all concrete surfaces exposed to view. <br /> c. Smooth Rubbed Finish : <br /> Concrete shall have a Smooth Rubbed Finish applied to produce an <br /> Architectural effect. <br /> 3 . Patching : <br /> Immediately after stripping forms patch all defective areas with mortar <br /> similar to the concrete mix except that coarse aggregate shall be omitted . <br /> Bulges, minor honeycomb and other minor defects, as designated by the <br /> Architect, shall be patched only where exposed to view. Clean, dampen, <br /> and fill tie holes with patching mortar. All patching shall follow procedures <br /> and conform to ACI 301 : <br /> a. Major defective areas , as judged by the Owner' s representative <br /> including those resulting from leakage of forms, excessive honeycomb, <br /> large bulges and large offsets at form joints , shall be chipped away <br /> down to sound concrete . The patching mortar shall be pressed in for <br /> a complete bond and finished to match adjacent areas , or where <br /> defective areas impair the strength of the member in question, as judged <br /> by the Owner ' s representative, the member shall be removed or united <br /> as determined by the Owner ' s representative . <br /> 03300-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.