My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' b . Minor defective areas , as judged by the Owner ' s representative <br /> including honeycomb, air bubbles, holes resulting from removal of ties, <br /> and those resulting from leakage of forms shall be patched with grout <br /> ' without resorting to chipping . Minor bulges and offsets at form joints <br /> shall be finished as specified herein below. <br /> ' Be Uniform Surfaces - Flatwork <br /> General : <br /> Grade and screed the surfaces to the exact elevation, or slope shown or <br /> required. Make proper allowances for setting beds for ceramic tile . After <br /> ' screeding tamp mixture thoroughly to drive the coarse aggregate down from <br /> the surfaces and apply the applicable finish specified hereinafter. Always <br /> slope exterior walks away from the building at 1 /4 " per foot. Uncovered <br /> walks slope at 1 /4 " per foot or crown. Covered walks between buildings <br /> always slope to drain to the exterior and away from the buildings . At cross <br /> intersections of the walks, and at exterior doors, warp the surfaces to drain <br /> ' water from the walls . Provide control joints as indicated on drawings . <br /> Follow the requirements and procedures of ACI 301 . <br /> ' 2 . Finishes - Definitions (See also ACI 301 ) <br /> a. Scratched Finish: <br /> ' After concrete has been placed, struck off, consolidated and leveled <br /> to a Class B tolerance, surface shall be roughened with stiff brush, <br /> ' rates or metal lath roller, before final set. <br /> b . Floated Finish : <br /> After concrete has been placed, struck off, consolidated and leveled, <br /> concrete shall not be worked further until water sheen has <br /> disappeared and/or when mix has stiffened sufficiently to permit <br /> proper operations of a power driven float. Consolidate with power <br /> driven float, check trueness of surface, fill low spots and cut sown <br /> high spots to achieve Class B tolerance . Then, re-float to uniform, <br /> ' smooth, granular texture . <br /> c . Troweled Finish : <br /> ' Finish same as above for floated finish and in addition, steel trowel <br /> the surface by hand to produce a smooth, glassy, impervious surface <br /> free of trowel marks to a Class A tolerance . On surfaces intended to <br /> ' support floor coverings , defects of sufficient magnitude to show <br /> through the floor covering shall be removed by grinding . <br /> ' d . Broom Finish : <br /> Finish same as above for floated finish to a Class B tolerance and <br /> tthen draw a broom or burlap belt across surface transversely. <br /> 03300-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.