My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-013.C
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-013.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 10:05:33 AM
Creation date
9/30/2015 7:14:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/13/2004
Control Number
2004-013.C
Agenda Item Number
11.I.1
Entity Name
Barth Construction
Subject
North County Regional Park Volume II
Contract and Specifications
Area
North County Regional Park
Project Number
0399
Bid Number
6038
Archived Roll/Disk#
3209
Supplemental fields
SmeadsoftID
3589
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 2 SITE WORK <br /> SECTION 2A - LANDSCAPING <br /> PART 1 - GENE <br /> RAL <br /> 1 , DESCRIPTION OF WORK <br /> A. Work included : This section is part of the entire set of contract documents and <br /> shall be coordinated with the applicable provisions of the other parts . <br /> B . The extent of the landscape development work is shown on the drawings and in <br /> schedules . Completion of the work shall mean full and exact compliance and <br /> conformity with the provisions expressed or implied in the drawings and <br /> specifications. <br /> C . The work under this section includes supplying and planting of trees, shrubs and <br /> ground covers in accordance with sound nursery practice and maintaining and <br /> watering them until final completion and acceptance, but not less than 30 days <br /> from installation, and any other work as called for on the plans and in these <br /> specifications. <br /> 2 . RELATED WORK <br /> A. Site work (rough grading) . <br /> B . Irrigation (see irrigation specifications) . <br /> 3 . QUALITY ASSURANCE <br /> A. QUALIFICATIONS OF INSTALLERS : The Contractor shall have his labor <br /> crews controlled and directed by a landscape foreman well versed in plant <br /> materials, planting, reading blueprints and coordination between job and nursery, <br /> in order to execute installation rapidly and correctly. <br /> B . TREES AND SHRUBS : Provide trees and shrubs grown in a recognized nursery <br /> in accordance with good horticultural practice. (The only exception shall be native <br /> plant material collected from field locations. ) Provide healthy vigorous stock <br /> grown under climatic conditions similar to conditions in the locality of the project <br /> and free of disease, insects, eggs, larvae, and defects such as knots, sun-scald, <br /> injuries, abrasions, or disfigurements. All plant material shall be graded Florida <br /> No . I or better as outlined under Grades and Standards for Nursery Plants, State <br /> Plant Board of Florida. <br /> 4 . PRODUCT HANDLING <br /> A. DELIVERY AND STORAGE : The balls of B & B plants which cannot be <br /> planted immediately on delivery shall be covered with moist soil or mulch or other <br /> protection from drying wind and sun. All plants shall be watered as necessary until <br /> planted . <br /> 2A - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.